Related Documents
Document for application/appeal number: 22/0313
Please click on each correspondence type header to see all related documents.
Please note: some people report issues using this search facility in the Chrome browser. If you encounter problems please try switching to an alternative browser.
- Application Details
- 07/03/2022_ApplicationFormRedacted
- 07/03/2022_FeeCalculation
- 07/03/2022_Schedule of Work
- 07/03/2022_Existing Elevations
- 07/03/2022_Planning Drawings Issue Sheet
- 07/03/2022_CIL Form 1 - Additional Information
- 07/03/2022_Honeylands Covering Letter
- 07/03/2022_Arboricultural Impact Assessment
- 07/03/2022_Tree Constraints Plan 24.1.20-TCP
- 07/03/2022_Tree Protection Plan Rev A 22.2.22[67]
- 07/03/2022_Tree Survey 09.21
- 07/03/2022_Preliminary Ecological Appraisal Report rev05
- 07/03/2022_Heritage Statement AC Arch Feb 2022
- 07/03/2022_Geophys survey
- 07/03/2022_Noise Impact Assessment - Honeylands Care Home v3
- 07/03/2022_Utilities Statement
- 07/03/2022_HONEYLANDS PLANNING STATEMENT
- 07/03/2022_Planning Statement - Appendix 1
- 07/03/2022_Planning Statement - Appendix 2a
- 07/03/2022_Planning Statement - Appendix 2b
- 07/03/2022_Planning Statement - Appendix 3b
- 07/03/2022_Planning Statement - Appendix 3c
- 07/03/2022_Planning Statement - Appendix 3a
- 07/03/2022_Flood Risk & Drainage incl ph2 geotech contam - REV B-complete
- 07/03/2022_SUSTAINABILITY STATEMENT
- 07/03/2022_Stage 1 RSA Designers Response
- 07/03/2022_Stage 1 RSA Highway Access Works
- 07/03/2022_Transport Statement - REV C-complete
- 07/03/2022_Sustainability Statement - Appendix 1
- 07/03/2022_Structural Inspection Report (Air Raid Shelter) 20.247 -Rev A
- 07/03/2022_Sustainability Statement Appendix 2 part 1/2
- 07/03/2022_Sustainability Statement Appendix 2 part 2/2
- 07/03/2022_Design and Access Statement 20220302 Part 1
- 07/03/2022_Design and Access Statement 20220302 Part 2
- 07/03/2022_Design and Access Statement 20220302 Part 3
- 13/05/2022_Bat Emergence and Activity Survey
- 30/06/2022_Planning Statement Adendum
- 29/06/2022_REVISED Heritage Statement June 2022
- 29/06/2022_REVISED AIA Rev A 27.6.22[68]
- 29/06/2022_REVISED Tree Protection Plan 05367 LSP Rev B 27.6.22[51]
- 04/07/2022_REVISED Design and Access Statement Pt1
- 04/07/2022_REVISED Design and Access Statement Pt2
- 04/07/2022_REVISED Design and Access Statement Pt3
- 04/07/2022_REVISED Proposed 3D Images
- 13/05/2022_Reponse to inital Ecology Comments
- Comments and Objections
- 30/03/2022_Environmental Health response
- 01/04/2022_D&C Police response
- 06/04/2022_D&S Fire and Rescue
- 11/04/2022_Natural England Response
- 11/04/2022_South West Water
- 10/04/2022_ECC Ecology Advice
- 25/03/2022_DCC Waste Planning
- 17/04/2022_Exeter Cycling Campaign
- 22/04/2022_Historic England Response
- 19/04/2022_Exeter Cycling Campaign
- 21/04/2022_RSPB Comments
- 21/04/2022_RSPB Comments attachment
- 18/05/2022_Tree Officer Comments
- 16/05/2022_RDUH NHS Trust Response 1/2
- 16/05/2022_RDUH NHS Trust Response 2/2
- 16/05/2022_Updated ECC Ecology Advice
- 11/07/2022_D&S Police Revised Plans comments
- 12/07/2022_Tree Officer comments amended scheme
- 13/07/2022_Heritage Officer comments
- 14/07/2022_DCC Highway Authority (corrected)
- 29/04/2022_NHS Devon Clinical Commissioning Group (CCG)
- Decision
- Drawings and Plans
- 07/03/2022_Site Location Plan
- 07/03/2022_PL08 A Proposed Ground Floor Plan
- 07/03/2022_PL07 A Proposed Lower Ground Floor Plan
- 07/03/2022_PL04 A Existing Building - Demolition Plans
- 07/03/2022_PL03 A Site Demolition Plan
- 07/03/2022_PL16 A Proposed Bin Store and Cycle Shelter
- 07/03/2022_PL11 B Proposed Elevations 1
- 07/03/2022_PL12 B Proposed Elevations 2
- 07/03/2022_PL10 A Proposed Roof Plan
- 07/03/2022_PL13 B Proposed Elevations 3
- 07/03/2022_PL05 G Proposed Site Plan
- 07/03/2022_PL06 A Proposed Site Boundary Plan
- 07/03/2022_PL02 A Exisiting Site Plan
- 07/03/2022_PL14 A Proposed Sections
- 07/03/2022_PL09 A Proposed First Floor Plan
- 07/03/2022_PL15 A Proposed 3D Images
- 07/03/2022_Listed Building drawing set SK020-SK039 RevA
- 07/03/2022_SK029 Existing - Basement
- 07/03/2022_SK030 Existing - Ground
- 07/03/2022_SK031 Existing - First
- 07/03/2022_SK032 Existing - Roof
- 07/03/2022_Honeylands Floor Plan Existing
- 07/03/2022_Highway drawing 1001-PHL-101-E
- 29/06/2022_REVISED Landscape Plan 05367 LSP Rev B 27.6.22[51]
- 30/06/2022_REVISED 9588-PL06B Proposed Site Boundary Plan[33]
- 30/06/2022_REVISED 9588-PL07C Proposed Lower Ground Floor Plan[14]
- 30/06/2022_REVISED 9588-PL08C Proposed Ground Floor Plan[29]
- 30/06/2022_REVISED 9588-PL09C Proposed First Floor Plan[63]
- 30/06/2022_REVISED 9588-PL10B Proposed Roof Plan[16]
- 30/06/2022_REVISED 9588-PL11D Proposed Elevations 1[16]
- 30/06/2022_REVISED 9588-PL12C Proposed Elevations 2[76]
- 30/06/2022_REVISED 9588-PL13C Proposed Elevations 3[96]
- 30/06/2022_REVISED 9588-PL14B Proposed Sections[10]
- 30/06/2022_REVISED 9588-PL18 Proposed Boundary Treatment - Fence Detail[38]
- 30/06/2022_REVISED 9588-PL05L Proposed Site Plan[97]
- 29/06/2022_1001-PHL-101-F[5]
- Other Application Information