Related Documents
Document for application/appeal number: 10/2088
Please click on each correspondence type header to see all related documents.
Please note: some people report issues using this search facility in the Chrome browser. If you encounter problems please try switching to an alternative browser.
- Application Details
- Comments and Objections
- Conditions Compliance
- Decision
- Drawings and Plans
- 23/12/2010_Planning Statement
- 23/12/2010_DWG NO. Site Location Plan
- 23/12/2010_DWG NO. Site Location Plan
- 23/12/2010_DWG NO. 2898_PL_001_SiteLocationPlan
- 23/12/2010_DWG NO. 2898_PL_002_IllustrativeMasterplan
- 23/12/2010_DWG NO. 2898_PL_003_IllustrativeMasterplanContext
- 23/12/2010_DWG NO. 2898_PL_004_LandscapeContext
- 23/12/2010_DWG NO. 2898_PL_010_ProposedSiteSections
- 23/12/2010_Appendix 1.2 Site Location Plan
- 23/12/2010_Appendix 2.1 Illustrative Masterplan
- 23/12/2010_Appendix 2.2 Application Site Plan
- 23/12/2010_Appendix 4.2 Noise Survey Locations
- 23/12/2010_Appendix 6.2 Fig.01 Site Locatin Plan
- 23/12/2010_Appendix 6.2 Fig.02 Site Layout and Zoneation Plan
- 23/12/2010_Appendix 6.2 Fig.03 Exploratory Hole Location Plan
- 23/12/2010_Appendix 6.3 Fig.01 Site Locatin Plan pdf
- 23/12/2010_Appendix 6.3 Fig.02 Site Layout and Zonation Plan
- 23/12/2010_Appendix 6.3 Fig.03 Exploratory Hole Location Plan
- 23/12/2010_Appendix 6.5 Fig.01 Site Locatin Plan
- 23/12/2010_Appendix 6.5 Fig.02 Exploratory Hole Location Plan REV D
- 23/12/2010_Appendix 11.1 H - PBA drawing
- 23/12/2010_Appendix 11.2 Figure 3-1b - Site Location Plan TAR
- 23/12/2010_Appendix 11.2 Figure 3-2c - Facilities Plan TAR
- 23/12/2010_Appendix 11.2 Figure 3-7c - PT plan TAR
- 23/12/2010_Appendix 11.2 Figure 3-9b - Accident Data Plan v3 TAR
- 23/12/2010_Appendix 11.2 Travel Plan
- 23/12/2010_Appendix 11.2 Travel Plan Figure 3-1 - Site Location Plan for TP
- 23/12/2010_Appendix 11.2 Travel Plan Figure 3-2 - Walking and Cycling Plan for TP
- 23/12/2010_Appendix 11.2 Travel Plan Figure 3-3 - Walk for TP
- 23/12/2010_Appendix 11.2 Figure 3-6 - PT plan for TP
- 23/12/2010_Appendix 11.2 Figure 3-7 - Facilities Plan for TP
- 27/06/2011_DWG NO. 21669-002-001B - Proposed Site Accesses
- 13/07/2011_DWG NO. 2898_SK100_REV A - Public Rights Of Way
- 13/07/2011_DWG NO. 500 - Survey Plan
- 13/07/2011_DWG NO. 502 - Site Sections December 2010
- 13/07/2011_DWG NO. 503 - Site Sections December 2010
- 13/07/2011_DWG NO. 504 - Site Sections December 2010
- 13/07/2011_DWG NO. 505 - Site Sections December 2010
- 13/07/2011_DWG NO. Eastern Fields Potential Road Alignment Option 3
- 22/06/2011_DWG NO. PSS.288-2 - Site Topographic Survey
- 04/03/2015_Email to agent re Condition 28 (Access drawing)
- 04/03/2015_21669-002-001-C_Proposed Site Accesses - Revised and approved
- Other Application Information
- 23/12/2010_SUPERSEDED Statement Of Community Involvement
- 23/12/2010_Design and Access Statement 1 of 3
- 23/12/2010_Design and Access Statement 2 of 3
- 23/12/2010_Design and Access Statement 3 of 3
- 23/12/2010_Appendix 1.1 Front Cover
- 23/12/2010_Appendix 1.1 Method of Assessing Environmental Effects
- 23/12/2010_Appendix 1.3 Aerial View
- 23/12/2010_Appendix 2.3 Development Platform Profile
- 23/12/2010_Appendix 2.4 Platform Cross Sections
- 23/12/2010_Appendix 2.5 Public Rights of Way
- 23/12/2010_Appendix 3.1 Devon County Council Correspondance
- 23/12/2010_Appendix 4.1 Glossary of Acoustic Terms
- 23/12/2010_Appendix 4.3 Noise Survey Results
- 23/12/2010_Appendix 4.4 Site Regrading Contours
- 23/12/2010_Appendix 4.5 Noise Exposure Category Contours
- 23/12/2010_Appendix 5.2 Herpetolgical Survey Report
- 23/12/2010_Appendix 6.1 Geoenvironmental Desk Study
- 23/12/2010_Appendix 6.4 Report on RIGS
- 23/12/2010_Appendix 7.1 Flood Risk Assessment
- 23/12/2010_Appendix 7.1 Flood Risk Assessment
- 23/12/2010_Appendix 9.1 Heritage Desk Based Assessment
- 23/12/2010_Environmental Statement Volume 1
- 23/12/2010_Environmental Statement Volume 2
- 23/12/2010_Appendix 5.1 Ecological Impact Appraisal
- 23/12/2010_Appendix 6.2 Ground Investigation Factual Report
- 23/12/2010_Appendix 6.2 A - Slope Data
- 23/12/2010_Appendix 6.2 B - Trial Pit Records
- 23/12/2010_Appendix 6.2 C - Cable Percusion Records
- 23/12/2010_Appendix 6.2 D - Rotary Open Hole Records
- 23/12/2010_Appendix 6.2 E - Inclinometer Graphs
- 23/12/2010_Appendix 6.2 F - VW Peizo Results
- 23/12/2010_Appendix 6.2 F - VW Peizo Results
- 23/12/2010_Appendix 6.2 G - Rotary Core Records
- 23/12/2010_Appendix 6.2 H - Monitoring Results
- 23/12/2010_Appendix 6.2 I - Chemical Results
- 23/12/2010_Appendix 6.2 J - Geotechnical Results
- 23/12/2010_Appendix 6.2 K - Rising Head Test
- 23/12/2010_Appendix 6.3 A - Stereographic Projections
- 23/12/2010_Appendix 6.3 B - Slope Stability Analysis
- 23/12/2010_Appendix 6.3 C - Vertical Stress Plot
- 23/12/2010_Appendix 6.3 D - Radon Geological Assessment Report
- 23/12/2010_Appendix 6.3 Fig.04 Proposed Development Platform
- 23/12/2010_Appendix 6.3 R2 Rev A final issue
- 23/12/2010_Appendix 6.5 Appendix B - Plate Load Test Results
- 23/12/2010_Appendix 6.5 Appendix C - CBR Probe Test Results
- 23/12/2010_Appendix 6.5 Appendix D - Percolation Test Results
- 23/12/2010_Appendix 6.5 Appendix E - Geotechnical Laboratory Test Results
- 23/12/2010_Appendix 6.5 R3 2010 09 27 pc dj final issue
- 23/12/2010_Appendix 10.1 LVIA
- 23/12/2010_Appendix 11.1 Transport Assessment
- 23/12/2010_Appendix 11.1 D - Full survey results
- 23/12/2010_Appendix 11.1 Appendix 11.1 E - 2010 traffic flows
- 23/12/2010_Appendix 11.1 F - 2010 Junction assessment results
- 23/12/2010_Appendix 11.2 Figure 2-1a - Proposals Map TAR
- 23/12/2010_Appendix 11.2 Figure 3-3b - Walk TAR
- 23/12/2010_Appendix 11.2 Figure 3-4b - Cycle TAR
- 23/12/2010_Appendix 11.2 Figure 3-5a - Table TAR
- 23/12/2010_Appendix 11.2 Figure 3-6c - Walking and Cycling TAR
- 23/12/2010_Appendix 11.2 Figure 3-8b -Stage 2 Assessment links &juncts for testing TAR
- 23/12/2010_Appendix 11.2 Figure 6-1 - Summary Modelling Results Table TAR
- 23/12/2010_Appendix 11.2 Figure 3-4 - Cycle for TP
- 23/12/2010_Appendix 11.2 Figure 3-5 - Table for TP
- 30/03/2011_Supplementary Design Information
- 23/12/2010_Archaeology & Cultural Heritage Desk Based Assessment
- 20/05/2011_Correspondence Documents
- 13/07/2011_Consultations
- 08/04/2011_Justification For Exhibition Way
- 13/07/2011_Technical Notes
- 13/07/2011_Magnetometer Survey Report
- 13/07/2011_Statement Of Pre-application Community Involvement
- 10/02/2012_S106 Agreement
- 24/09/2013_Inspectors Report
- 30/09/2014_Email Correspondence
- 22/10/2014_Correspondence Documents
- 06/03/2019_Deed of Variation s106 Pinhoe Quarry as completed 060319
- 20/10/2020_Email to agent enclosing letter re S106 Obligations
- 06/11/2020_Agent email enclosing Travel Plan pursuant to S106 Agreement
- 16/12/2020_Email from DCC confirming revocation of previous minerals consent
- 11/05/2021_2nd Deed of Variation
- Photographs