Related Documents
Document for application/appeal number: 23/0232
Please click on each correspondence type header to see all related documents.
Please note: some people report issues using this search facility in the Chrome browser. If you encounter problems please try switching to an alternative browser.
- Application Details
- 09/02/2023_Cowley Bridge Road_Design and Access Statement_Part 1of7.pdf
- 09/02/2023_Cowley Bridge Road_Design and Access Statement_Part 2of7.pdf
- 09/02/2023_Cowley Bridge Road_Design and Access Statement_Part 3of7.pdf
- 09/02/2023_Cowley Bridge Road_Design and Access Statement_Part 4of7.pdf
- 09/02/2023_Cowley Bridge Road_Design and Access Statement_Part 5of7.pdf
- 09/02/2023_Cowley Bridge Road_Design and Access Statement_Part 6of7.pdf
- 09/02/2023_Cowley Bridge Road_Design and Access Statement_Part 7of7.pdf
- 09/02/2023_SUPERSEDED 2021-116_Doc0010rev_Planning Document Enclosure Summary.pdf
- 11/04/2023_Torbay and South Devon NHS TRUST
- 29/08/2023_2021 - 116_Doc0010revA_Planning Document Enclosure Summary
- ApplicationDetails
- 09/02/2023_Ground Investigation ref 14710-HYD-XX-XX-GE-1002 P1 S2 ISSUE_Part2of4.pdf
- 09/02/2023_Ground Investigation ref 14710-HYD-XX-XX-GE-1002 P1 S2 ISSUE_Part3of4.pdf
- 09/02/2023_Ground Investigation ref 14710-HYD-XX-XX-GE-1002 P1 S2 ISSUE_Part4of4.pdf
- 09/02/2023_Noise Assessment ref 24558-HYD-ZZ-XX-RP-Y-1001-Noise Planning Report-P03.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part10of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part11of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part12of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part1of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part2of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part3of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part4of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part5of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part6of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part7of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part8of12.pdf
- 09/02/2023_Phase 1 Desktop Report ref 14710-HYD-XX-XX-RP-GE-1001 P1 S2 ISSUE_Part9of12.pdf
- 09/02/2023_Site Waste Management Plan ref 24558-HYD-XX-XX-XX-RP-6001-P1 - SWMP P3.pdf
- 09/02/2023_SuDS supporting information_included_in_Drainage documentation.pdf
- 09/02/2023_Sustainability Statement ref 30028-MCP-ZZ-ZZ-RP-N-2010.pdf
- 09/02/2023_Preliminary Ecology Assessment_19949 Exeter Student Residential Scheme PEA v1.0 with appendix_Part1of2.pdf
- 09/02/2023_Preliminary Ecology Assessment_19949 Exeter Student Residential Scheme PEA v1.0 with appendix_Part2of2.pdf
- 09/02/2023_Transport Assessment 24558-HYD-XX-XX-RP-TP-5001-P02_Part1of2.pdf
- 09/02/2023_Transport Assessment 24558-HYD-XX-XX-RP-TP-5001-P02_Part2of2.pdf
- 09/02/2023_Travel Plan ref 24558-XX-XX-RP-TP-6001-P02_Part1of2.pdf
- 09/02/2023_Travel Plan ref 24558-XX-XX-RP-TP-6001-P02_Part2of2.pdf
- 09/02/2023_Utilities Report by McCann and Partners.pdf
- 09/02/2023_Air Quality Assessment ref 20988-HYD-ZZ-XX-YY-RP-2001_P03.pdf
- 09/02/2023_ApplicationFormRedacted.pdf
- 09/02/2023_Arb Report by ESL Ltd_November_2022v3.pdf
- 09/02/2023_AttachmentSummary.pdf
- 09/02/2023_CIL Form 1_Completed.pdf
- 09/02/2023_Daylight and Sunlight Addendum ref 24558-HYD-ZZ-00-DN-5001-P01.pdf
- 09/02/2023_Daylight and Sunlight Assessment_24558-HYD-ZZ-00-RP-0001-P01.pdf
- 09/02/2023_Drainage Strategy Report 24558-HYD-XX-ZZ-RP-C-7000_Part1of2.pdf
- 09/02/2023_Drainage Strategy Report 24558-HYD-XX-ZZ-RP-C-7000_Part2of2.pdf
- 09/02/2023_FeeCalculation.pdf
- 09/02/2023_Flood Risk Assessment ref 24558-HYD-XX-XX-RP-FR-0001 P03_Part1of2.pdf
- 09/02/2023_Flood Risk Assessment ref 24558-HYD-XX-XX-RP-FR-0001 P03_Part2of2.pdf
- 09/02/2023_Ground Investigation ref 14710-HYD-XX-XX-GE-1002 P1 S2 ISSUE_Part1of4.pdf
- 26/10/2023_2021-116_0102_RevD_PROPOSED SITE PLAN .pdf
- 30/10/2023_2021-116_0102_RevD_PROPOSED SITE PLAN _001.png
- 26/10/2023_2021-116_0109_RevG_MASTERPLAN LOWER GROUND FLOOR.pdf
- 26/10/2023_2021-116_0110_RevK_MASTERPLAN GROUND FLOOR .pdf
- 26/10/2023_2021-116_0111_RevJ_MASTERPLAN FIRST FLOOR .pdf
- 26/10/2023_2021-116_0112_RevJ_MASTERPLAN SECOND FLOOR .pdf
- 26/10/2023_2021-116_0113_RevJ_MASTERPLAN THIRD FLOOR .pdf
- 26/10/2023_2021-116_0114_RevJ_MASTERPLAN FOURTH FLOOR .pdf
- 26/10/2023_2021-116_0115_RevJ_MASTERPLAN FIFTH FLOOR .pdf
- 26/10/2023_2021-116_0116_RevG_MASTERPLAN ROOF PLAN .pdf
- 26/10/2023_2021-116_0120_RevC_PROPOSED SITE ELEVATIONS .pdf
- 30/10/2023_2021-116_0130_RevE_PROPOSED SITE SECTIONS (1 OF 2).pdf
- 26/10/2023_2021-116_0131_RevD_PROPOSED SITE SECTIONS (2 OF 2).pdf
- 26/10/2023_2021-116_0802_RevD_PRELIMINARY LEVELS PLAN.pdf
- 26/10/2023_2021-116_A0009_RevG_PROPOSED FLOOR PLANS BLOCK A.pdf
- 26/10/2023_2021-116_A0020_RevF_PROPOSED ELEVATIONS BLOCK A.pdf
- 26/10/2023_2021-116_B0009_RevG_PROPOSED FLOOR PLANS BLOCK B.pdf
- 26/10/2023_2021-116_B0020_RevG_PROPOSED ELEVATIONS BLOCK B.pdf
- 26/10/2023_2021-116_C0009_RevG_PROPOSED FLOOR PLANS BLOCK C.pdf
- 26/10/2023_2021-116_C0020_RevF_PROPOSED ELEVATIONS BLOCK C.pdf
- 26/10/2023_2021-116_D0009_RevH_PROPOSED FLOOR PLAN BLOCK D.pdf
- 26/10/2023_2021-116_D0020_RevG_PROPOSED ELEVATIONS BLOCK D.pdf
- 26/10/2023_2021-116_Doc0010revB_Planning Document Enclosure Summary.docx
- 25/10/2023_2021-116_Doc0010revB_Planning Document Enclosure Summary.pdf
- 26/10/2023_24558-HYD-XX-XX-RP-FR-0001-P04.pdf
- Comments and Objections
- 07/03/2023_Env Health Response
- 22/03/2023_Police ALO comments
- 24/03/2023_Devon & Somerset Fire & Rescue response
- 31/03/2023_Environment Agency response
- 06/03/2023_Wales and West utilities Reposnse
- 21/05/2023_DCC LLFA response
- 06/03/2023_ECC Waste Team
- 28/03/2023_ECC Arboricultural response
- 28/03/2023_ECC Ecology and Biodiversity Comments
- 16/05/2023_DCC Highways Comments
- 12/09/2023_SWW Response
- 15/09/2023_Network Rail
- 05/09/2023_DS Fire and Rescue
- 05/09/2023_D&C Police 05092023
- 23/03/2023_DCC Waste Comments 23032023
- 25/09/2023_EA Revised Response 25092023
- 16/03/2023_Wales and West Utilities Response
- 07/03/2023_SWW Response
- 22/03/2023_Network Rail comments
- 24/10/2023_Flood Risk Comments
- Decision
- Drawings and Plans
- 09/02/2023_Landscape Masterplan LDP-22-P152 1001B
- 09/02/2023_SUPERSEDED MASTERPLAN FIRST FLOOR 2021.116_0111_Rev G
- 09/02/2023_SUPERSEDED MASTERPLAN SECOND FLOOR 2021.116_0112_Rev G
- 09/02/2023_SUPERSEDED MASTERPLAN THIRD FLOOR 2021.116_0113_Rev G
- 09/02/2023_SUPERSEDED MASTERPLAN FOURTH FLOOR 2021.116_0114_Rev G
- 09/02/2023_SUPERSEDED MASTERPLAN FIFTH FLOOR 2021.116_0115_Rev G
- 09/02/2023_LOCATION PLAN (PLANNING RED LINE BOUNDARY) 2021-116_0101_RevB_
- 09/02/2023_SUPERSEDED PROPOSED SITE PLAN 2021-116_0102_RevB
- 09/02/2023_EXISTING SITE PLAN 2021-116_0103_RevC
- 09/02/2023_SUPERSEDED MASTERPLAN LOWER GROUND FLOOR 2021-116_0109_RevE
- 09/02/2023_SUPERSEDED MASTERPLAN GROUND FLOOR 2021-116_0110_RevH
- 09/02/2023_SUPERSEDED PROPOSED SITE ELEVATIONS 2021-116_0120_RevA
- 09/02/2023_SUPERSEDED PROPOSED SITE SECTIONS (1 OF 2) 2021-116_0130_RevC
- 09/02/2023_SUPERSEDED PROPOSED SITE SECTIONS (2 OF 2) 2021-116_0131_RevB
- 09/02/2023_SUPERSEDED PRELIMINARY FINISHED LEVELS 2021-116_0802_RevB
- 09/02/2023_SUPERSEDED PROPOSED FLOOR PLANS BLOCK A 2021-116_A0009_RevE
- 09/02/2023_SUPERSEDED PROPOSED ELEVATIONS BLOCK A 2021-116_A0020_RevD
- 09/02/2023_SUPERSEDED PROPOSED FLOOR PLANS BLOCK B 2021-116_B0009_RevE
- 09/02/2023_SUPERSEDED PROPOSED ELEVATIONS BLOCK B 2021-116_B0020_RevE
- 09/02/2023_SUPERSEDED PROPOSED FLOOR PLANS BLOCK C 2021-116_C0009_RevE
- 09/02/2023_SUPERSEDED PROPOSED ELEVATIONS BLOCK C 2021-116_C0020_RevD
- 09/02/2023_SUPERSEDED PROPOSED FLOOR PLAN BLOCK D 2021-116_D0009_RevE
- 09/02/2023_SUPERSEDED PROPOSED ELEVATIONS BLOCK D 2021-116_D0020_RevD
- 09/02/2023_SUPERSEDED FLOOR PLANS BLOCK E 2021-116_E0009_RevE
- 09/02/2023_SUPERSEDED ELEVATIONS BLOCK E 2021-116_E0020_RevC
- 29/08/2023_SUPERSEDED Proposed Floor Plans Block A 2021-116_A0009_RevF
- 29/08/2023_Proposed Elevations Block A 2021-116_A0020_RevE
- 29/08/2023_Proposed Floor Plans Block B 2021-116_B0009_RevF
- 29/08/2023_PROPOSED ELEVATIONS BLOCK B 2021_B00020_RevF
- 29/08/2023_PROPOSED FLOOR PLANS BLOCK C 2021-116_C0009_RevF
- 29/08/2023_PROPOSED ELEVATIONS BLOCK C 201-116_C0020_Rev E
- 29/08/2023_PROPOSED FLOOR PLANS BLOCK D 201-116_D0009_RevG
- 29/08/2023_PROPOSED ELEVATIONS BLOCK D 2021-116_D0020_RevF
- 29/08/2023_SUPERSEDED PROPOSED SITE PLAN 2021-116_0102_RevC
- 29/08/2023_SUPERSEDED MASTERPLAN LOWER GROUND FLOOR 2021-116_0109_RevF
- 29/08/2023_SUPERSEDED MASTERPLAN GROUND FLOOR 2021-116_0110_RevJ
- 29/08/2023_SUPERSEDED MASTERPLAN FIRST FLOOR 2021-116_0111_RevH
- 29/08/2023_MASTERPLAN SECOND FLOOR 2021-116_0112_RevH
- 29/08/2023_MASTERPLAN THIRD FLOOR 2021-116_0113-RevH
- 29/08/2023_MASTERPLAN FOURTH FLOOR 2021-116_0114_RevH
- 29/08/2023_MASTERPLAN FIFTH FLOOR 2021-116_0115_RevH
- 29/08/2023_MASTERPLAN ROOF PLAN 2021-116_0116_RevF
- 29/08/2023_PROPOSED SITE ELEVATIONS 2021-116_0120_RevB
- 29/08/2023_PROPSOED SITE SECTIONS (1 OF 2) 2021-116_0130_RevD
- 29/08/2023_PROPOSED SITE SECTIONS (2 OF 2) 2021-116_0131_RevC
- 29/08/2023_PRELIMINARY LEVELS PLAN 2021-116_0802_RevC
- Other Application Information
- 29/08/2023_Sequential Test 2021-116_Doc_0016RevA
- 29/08/2023_Flood Risk Assessment 24558-HYD-XX-XX-RP-FR-0001-P04
- 29/08/2023_Drainage Strategy Part 1 24558-HYD-XX-XX-RP-C-7000-PO2
- 29/08/2023_Drainage Strategy Part 2 24558-HYD-XX-ZZ-RP-C-7000-P02
- 29/08/2023_Addendum D&A Statement Part 1 Doc 00158RevF
- 29/08/2023_Addendum D&A Statement Part 2 Doc0015RevF
- 02/11/2023_Appropriate Assessment PBSA
- 20/12/2023_225024 - 2023 12 20 s106 Cowley Bridge Rd (Completed)(Metropolitan)
- 20/12/2023_225023 - 2023 12 20 s106 Cowley Bridge Rd (Completed)(Johnsons)
- 20/12/2023_225022 - 2023 12 20 s106 Cowley Bridge Rd (Completed)(ECC)
- 08/12/2023_EoT 22122023