- 22/08/2023_Letter Application & Site Plan Redacted
- 21/08/2023_Planning Design Access Statement August_Chapters 01 and 02.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 03 Part 1.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 03 Part 2.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 03 Part 3.pdf
- 21/08/2023_Planning Design Access Statement August_Chapters 04 and 05.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 06 Part 1.pdf
- 21/08/2023_Planning Design Access Statement -August_Chapter 06 Part 2.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 06 Part 3.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 06 Part 4.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 07 Part 1.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 07 Part 2.pdf
- 21/08/2023_Planning Design Access Statement August_Chapters 08 and 09.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 10 Part 1.pdf
- 21/08/2023_Sequential Test_230727 18155_U06_001_U .pdf
- 21/08/2023_SUPERSEDED Landscape Townscape Visual Impact Assessment Appendix A Visual Baseline.pdf
- 21/08/2023_Planning Design Access Statement August_Chapter 10 Part 2.pdf
- 21/08/2023_SUPERSEDED Landscape Townscape Visual Impact Assessment Appendix C Landscape and Townscape Assessment.pdf
- 21/08/2023_SUPERSEDED Landscape Townscape Visual Impact Assessment Appendix D Visual Assessment.pdf
- 21/08/2023_SUPERSEDED Landscape Townscape Visual Impact Assessment Appendix E Methodology.pdf
- 21/08/2023_SUPERSEDED Landscape Townscape Visual Impact Assessment Report 196-G109_P1.pdf
- 21/08/2023_Transport Assessment_RevA-Appendices.pdf
- 21/08/2023_Transport Assessment_RevA-Document.pdf
- 21/08/2023_SUPERSEDED Transport Assessment_RevA-Drawings.pdf
- 21/08/2023_Transport Assessment_RevA-Figures.pdf
- 21/08/2023_Framework Travel Plan - rev A.pdf
- 21/08/2023_SUPERSEDED Sustainability Statement v0.pdf
- 21/08/2023_Utilities Statement_FINAL.pdf
- 21/08/2023_SUPERSEDED Surface Water and Foul Drainage Strategy.pdf
- 21/08/2023_SUPERSEDED Surface Water and Foul Drainage Strategy Appendix A Open Data Maps.pdf
- 21/08/2023_SUPERSEDED Surface Water and Foul Drainage Strategy Appendices B, C and D Surveys and proposals.pdf
- 21/08/2023_ApplicationFormRedacted.pdf
- 21/08/2023_Arboricultural Statement and Tree Survey for Land at Water Lane Exeter.pdf
- 21/08/2023_Ecological Impact Assessment Water Lane - February 2023.pdf
- 21/08/2023_SUPERSEDED Environmental Statement Appendix C1 Contamination Policy Context August 2023.pdf
- 21/08/2023_SUPERSEDED Environmental Statement Appendix C2_Part1 Contamination Interpretative Desk Study Report.pdf
- 21/08/2023_SUPERSEDED Environmental Statement Appendix C2_Part2 Contamination Interpretative Desk Study Report.pdf
- 21/08/2023_SUPERSEDED Environmental Statement Appendix C2_Part3 Contamination Interpretative Desk Study Report.pdf
- 21/08/2023_SUPERSEDED Environmental Statement Appendix C2_Part4 Contamination Interpretative Desk Study Report.pdf
- 21/08/2023_SUPERSEDED Environmental Statement Appendix C3 Contamination Land Assessment .pdf
- 21/08/2023_Geoenvironmental Interpretative Desk Study Report-Appendix A Groundsure Reports.pdf
- 21/08/2023_Geoenvironmental Interpretative Desk Study Report-Appendix B Historical Maps-part 1.pdf
- 21/08/2023_Geoenvironmental Interpretative Desk Study Report-Appendix B Historical Maps-part 2.pdf
- 21/08/2023_Geoenvironmental Interpretative Desk Study Report-Appendix C Site Photographs.pdf
- 21/08/2023_Geoenvironmental Interpretative Desk Study Report.pdf
- 21/08/2023_SUPERSEDED Lighting Strategy - Issue 2.pdf
- 21/08/2023_Lux Level Report.pdf
- 21/08/2023_BREEAM PA Report_Rev 1 SOL_23_S095_3AD - Exeter (Water Lane) (with appendices).pdf
- 21/08/2023_Air Quality Assessment - Baseline Policy and Methodology August 2023.pdf
- 21/08/2023_Environmental Statement - Baseline Policy and Methodology August 2023.pdf
- 21/08/2023_SUPERSEDED Water Lane FRA_Part1 August 2023.pdf
- 21/08/2023_SUPERSEDED Water Lane FRA_Part2 August 2023.pdf
- 21/08/2023_Health Impact Assessment - Baseline Policy and Methodology August 2023
- 21/08/2023_Waste Audit Statement August 2023.pdf
- 21/08/2023_SUPERSEDED Water Lane_Statement of Community Involvement FINAL_AH.pdf
- 21/08/2023_SUPERSEDED Landscape Townscape Visual Impact Assessment Appendix B Visualisations (part 1 of 2 viewpoints 1-11).pdf
- 21/08/2023_SUPERSEDED Landscape Townscape Visual Impact Assessment Appendix B Visualisations (part 2 of 2 viewpoints 12-23).pdf
- 30/08/2023_Archaeological desk based assessment Part 4 Photographs P1.1-P1.16 Revision 01
- 30/08/2023_Archaeological desk based assessment Part 4 Photographs P1.17-P1.34 Revision 01
- 30/08/2023_Archaeological desk based assessment Part 4 Photographs P1.35-P1.62 Revision 01
- 30/08/2023_Archaeological desk based assessment Part 1 Report Revision 05
- 30/08/2023_Townscape Heritage Assessment_Figures
- 30/08/2023_Townscape Heritage Assessment_Plate 1-16 (1)
- 30/08/2023_Townscape Heritage Assessment_Plate 1-16
- 30/08/2023_Townscape Heritage Assessment_Plate 17-31
- 30/08/2023_Archaeological desk based assessment Part 2 Figures-1-9 Revision 01
- 30/08/2023_Archaeological desk based assessment Part 3 Figures 10-18 Revision 01
- 20/10/2023_Environmental Statement Vol 2 App A.1 Site Location Plan.pdf
- 20/10/2023_Environmental Statement Vol 2 App B.1 Ecological Impact Assessment.pdf
- 20/10/2023_Environmental Statement Vol 2 App B.2 Biodiversity Net Gain Assessment.pdf
- 20/10/2023_Environmental Statement Vol 2 App B.3 Figures.pdf
- 20/10/2023_Environmental Statement Vol 2 App C.1 Contamination Policy Context August 2023.pdf
- 20/10/2023_Environmental Statement Vol 2 App C.2 Contamination Interpretative Desk Study Report_Part1.pdf
- 20/10/2023_Environmental Statement Vol 2 App C.2 Contamination Interpretative Desk Study Report_Part2.pdf
- 20/10/2023_Environmental Statement Vol 2 App C.2 Contamination Interpretative Desk Study Report_Part3.pdf
- 20/10/2023_Environmental Statement Vol 2 App C.2 Contamination Interpretative Desk Study Report_Part4.pdf
- 20/10/2023_Environmental Statement Vol 2 App C.3 Contamination Land Assessment.pdf
- 20/10/2023_Environmental Statement Vol 2 App D.1 Flood Risk Assessment.pdf
- 20/10/2023_Environmental Statement Vol 2 App D.2 Surface Water Drainage Strategy_Part1.pdf
- 20/10/2023_Environmental Statement Vol 2 App D.2 Surface Water Drainage Strategy_Part2.pdf
- 20/10/2023_Environmental Statement Vol 2 App D.2 Surface Water Drainage Strategy_Part3.pdf
- 20/10/2023_Environmental Statement Vol 2 App E.1 Waste Audit Statement.pdf
- 20/10/2023_Environmental Statement Vol 2 App E.2 Framework SWMP.pdf
- 20/10/2023_Environmental Statement Vol 2 App F.1 Noise Policy Context.pdf
- 20/10/2023_Environmental Statement Vol 2 App F.2 Glossary of Acoustic Terminology.pdf
- 20/10/2023_Environmental Statement Vol 2 App F.3 Instrumentation.pdf
- 20/10/2023_Environmental Statement Vol 2 App F.4 Figures.pdf
- 20/10/2023_Environmental Statement Vol 2 App F.5 Time History Graphs.pdf
- 20/10/2023_Environmental Statement Vol 2 App G.1 Policy.pdf
- 20/10/2023_Environmental Statement Vol 2 App G.2 Transport Assessment_Part1.pdf
- 20/10/2023_Environmental Statement Vol 2 App G.2 Transport Assessment_Part2.pdf
- 20/10/2023_Environmental Statement Vol 2 App G.3 Framework Travel Plan.pdf
- 20/10/2023_Environmental Statement Vol 2 App G.4 TN001 - Traffic Analysis.pdf
- 20/10/2023_Environmental Statement Vol 2 App G.5 Figures.pdf
- 20/10/2023_Environmental Statement.pdf
- 11/10/2023_Sustainability Statement v1 231004 Water Lane Exeter.pdf
- 20/10/2023_Air Quality Assessment.pdf
- 20/10/2023_Environmental Statement Non Technical Summary
- 20/10/2023_Environmental Statement Vol 2 App H.1 Archaeological Desk Based Assessment.pdf
- 20/10/2023_Environmental Statement Vol 2 App H.2 Townscape Heritage Assessment_Part1.pdf
- 20/10/2023_Environmental Statement Vol 2 App H.2 Townscape Heritage Assessment_Part2.pdf
- 20/10/2023_Health Impact Assessment
- 16/05/2024_Statement of Community Involvement UPDATE APRIL 2024
- 16/05/2024_External Lighting Strategy - Issue 3 IN380 - Water Lane
- 16/05/2024_LTVIA Appendix A Visual Baseline 196-G109_P2
- 16/05/2024_SUPERSEDED Outline Surface Water and Foul Dranage Strategy Appendix B-D Surveys and proposals 332310057
- 16/05/2024_Application Form Amendment Summary
- 21/08/2023_Statement of Community Involvement FINAL_AH
- 30/08/2023_Townscape Heritage Assessment
- 16/05/2024_SUPERSEDED Outline Surface Water and Foul Drainage Strategy 332310057
- 16/05/2024_SUPERSEDED Outline Surface Water and Foul Drainage Strategy Appendix A Open Data Maps 332310057
- 16/05/2024_Landscape and Townscape Visual Impact Assessment (LTVIA) 196-G109_P2
- 16/05/2024_Design Access Statement Addendum May 2024 Chapter 01 Part 1 18155-NP-XX-XX-RP-A-9002-1
- 16/05/2024_Design Access Statement Addendum May 2024 Chapter 03-04 All Parts 18155-NP-XX-XX-RP-A-9002-1
- 16/05/2024_LTVIA Appendix B Visualisations_part 1 of 2_viewpoints 1-11 196-G109_P2
- 16/05/2024_LTVIA Appendix B Visualisations_part 2 of 2_viewpoints 12-25 196-G109_P2
- 16/05/2024_LTVIA Appendix C Landscape and Townscape Assessment 196-G109_P2
- 16/05/2024_LTVIA Appendix D Visual Assessment 196-G109_P2
- 16/05/2024_LTVIA Appendix E Methodology 196-G109_P2
- 16/05/2024_Design Access Statement Addendum May 2024 Chapter 01 Part 2 18155-NP-XX-XX-RP-A-9002-1
- 16/05/2024_Design Access Statement Addendum May 2024 Chapter 01 Part 3 18155-NP-XX-XX-RP-A-9002-1-
- 16/05/2024_Design Access Statement Addendum May 2024 Chapter 01 Part 4 18155-NP-XX-XX-RP-A-9002-1-
- 16/05/2024_Design Access Statement Addendum May 2024 Chapter 02 Part 1 18155-NP-XX-XX-RP-A-9002-1
- 16/05/2024_Design Access Statement Addendum May 2024 Chapter 02 Part 2 18155-NP-XX-XX-RP-A-9002-1
- 16/05/2024_EIA Compliance Note Final for Amendment Submission
- 16/05/2024_Outline Storm Water and Foul Drainage Strategy (332310057)
- 16/05/2024_Flood Risk Assessment Rev B Part 1 20240516_Water Lane
- 16/05/2024_Flood Risk Assessment Rev B Part 2 20240516_Water Lane
- 16/05/2024_Flood Risk Assessment Rev B Part 3 20240516_Water Lane
- 16/05/2024_Flood Risk Assessment Rev B Part 4 20240516_Water Lane
- 16/05/2024_Air Quality Point Source Modelling Technical Note Jan 24
- 16/05/2024_Air Quality Point Source Modelling Update Technical Note May 24 Inc. Figures
- 16/05/2024_Response to EHO Comments on Environmental Statement in relation to Noise
- 16/05/2024_Response to Active Travel England Comments 240515_TR_TN002
- 16/05/2024_Environmental Statement Addendum Flood RIsk and the Water Environment
- 16/05/2024_Flood Risk Assessment Rev B Part 5 20240516_Water Lane
- 16/05/2024_Flood Risk Assessment Rev B Part 6 20240516_Water Lane
- 16/05/2024_Application Amendments Cover Letter_revB_ May 2024
- 28/06/2024_Ground INvestifgation (Full Scope) GJ176-06-R001-GI Scope
- 18/07/2024_Applicants HSE Pre application advice D2217_Rev 2
- 26/07/2024_Outline Surface Water & Foul Drainage Strategy Part 1/2
- 26/07/2024_Outline Surface Water & Foul Drainage Strategy Part 2/2
- Comments and Objections
- 08/09/2023_Lead Local Flood Authority (DCC) (Objects)
- 26/09/2023_South West Water
- 26/09/2023_SWW Attachment
- 02/10/2023_Historic England
- 03/10/2023_Exeter Cycling Campaign
- 03/10/2023_Network Rail
- 03/10/2023_DA1330_D176328 - Document attached to Network Rail Comment
- 04/10/2023_Objection Inland Waterways Association
- 04/10/2023_Devon Wildlife Trust (Objects)
- 04/10/2023_RSPB
- 04/10/2023_RSPB Swift brick guidance
- 05/10/2023_Active Travel England
- 05/10/2023_Royal Devon University Healthcare NHS Foundation Trust
- 05/10/2023_Devon County Council (Objects)
- 05/10/2023_ECC Tree Manager
- 09/10/2023_Devon and Somerset Fire and Rescue Service
- 05/10/2023_Friends of Exeter Ship Canal (Objects)
- 05/10/2023_Friends of Exeter Ship Canal / Greenwood Projects Assessment
- 11/10/2023_Environment Agency (Objects)
- 19/10/2023_Devon NHS
- 12/09/2023_Environmental Health Comments
- 10/11/2023_Exeter Civic Society Comments
- 05/10/2023_SUPERSEDED HSE Response
- 15/12/2023_Representation - Objection - Jane Green
- 11/01/2024_M&S Representation
- 26/09/2023_South West Water Plan
- 18/10/2023_Torbay and South Devon NHS Trust
- 18/10/2023_NHS Integrated Care Board response
- 26/01/2024_ECC Ecology and Biodiversity comments
- 28/06/2024_Natural England Response
- 23/06/2024_ECC Waste and Recycling
- 06/06/2024_Devon and Somerset Fire and Rescue Service
- 10/06/2024_DCC Flood and Drainage
- 29/09/2023_Historic England Response
- 20/06/2024_Active Travel England Formal Recommendations 2
- 24/06/2024_DCC response to 23.1007.OUT_Updated_Response_Sent_24062024
- 25/06/2024_Jane Green Objection to 23 1007 OUT 25 June 2024
- 25/06/2024_Historic Enlgand Reposne 25062024
- 26/06/2024_Friends of Exeter Ship Canal
- 28/06/2024_Harbour Master Response
- 01/07/2024_Exeter Civic Society
- 06/08/2024_Network Rail additional reponse
- 06/08/2024_HSE advice_23.1007.OUT_L2318 V1.2 issue 2
- 09/08/2024_Envoronment Agency Response 09082024
- 12/08/2024_Additional Ecology Reponse
- Drawings and Plans
- 21/08/2023_The Site 18155-NP-00-00-DR-A-00039-2
- 21/08/2023_SUPERSEDED Demolition and Retention Parameter Plan 18155-NP-00-00-DR-A-10014-2 OPA .pdf
- 21/08/2023_SUPERSEDED Framework Parameter Plan 18155-NP-00-00-DR-A-10015-3 OPA .pdf
- 21/08/2023_Topographical Survey 18155.pdf
- 21/08/2023_SUPERSEDED Tan Lane Concept Site Access.pdf
- 21/08/2023_SUPERSEDED Vertical Alignment_Tan Lane Tunnels.pdf
- 21/08/2023_Location Plan 18155-NP-00-00-DR-A-10001-3 OPA.pdf
- 21/08/2023_SUPERSEDED Building Height Parameter Plan 18155-NP-00-00-DR-A-10010-3 OPA .pdf
- 21/08/2023_SUPERSEDED External Lighting Strategy Sheet 1 of 2.pdf
- 21/08/2023_SUPERSEDED External Lighting Strategy Sheet 2 of 2.pdf
- 21/08/2023_Existing Lux Level Readings Sheet 1 of 2.pdf
- 21/08/2023_Existing Lux Level Readings Sheet 2 of 2.pdf
- 21/08/2023_Existing Site Plan 18155-NP-00-00-DR-A-10002-1 OPA .pdf
- 21/08/2023_SUPERSEDED Illustrative Layout 18155-NP-00-00-DR-A-10005-1 OPA.pdf
- 21/08/2023_SUPERSEDED Disposition of Uses Parameter Plan 18155-NP-00-00-DR-A-10011-3 OPA .pdf
- 21/08/2023_SUPERSEDED Green and Blue Infrastructure Parameter Plan 18155-NP-00-00-DR-A-10012-3 OPA .pdf
- 21/08/2023_SUPERSEDED Access Parameter Plan 18155-NP-00-00-DR-A-10013-3 OPA .pdf
- 16/05/2024_Concept Site Access and Swept Path Analysis 332310057-5503-001
- 16/05/2024_External Lighting Strategy Sheet 1 of 2 IN380(632)001
- 16/05/2024_External Lighting Strategy Sheet 2 of 2 IN380(632)002
- 16/05/2024_Illustrative Layout May 24 18155-NP-00-00-DR-A-10005-2
- 16/05/2024_Building Height Parameter Plan May 24 18155-NP-00-00-DR-A-10010-4
- 16/05/2024_Disposition of Uses Parameter Plan May 24 18155-NP-00-00-DR-A-10011-4 OPA
- 16/05/2024_Green and Blue Infrastructure Parameter Plan May 24 18155-NP-00-00-DR-A-10012-4
- 16/05/2024_Access Parameter Plan May 24 18155-NP-00-00-DR-A-10013-4
- 16/05/2024_Demolition and Retention Parameter Plan May 24 18155-NP-00-00-DR-A-10014-3
- 16/05/2024_Framework Parameter Plan May 24 18155-NP-00-00-DR-A-10015-4
- 16/05/2024_Proposed vertical alignment and clearance through Tan Lane Tunnels 332310057-5503-004_A
- 16/05/2024_Proposed Tan Lane Concept Site Access_332310057-5503-001-003
- 17/07/2024_PROPOSED HIGH PRESSURE GAS MAIN DIVERSION WTL-STN-PU-XX-DR-C-0003