Related Documents
Document for application/appeal number: 21/1564
Please click on each correspondence type header to see all related documents.
Please note: some people report issues using this search facility in the Chrome browser. If you encounter problems please try switching to an alternative browser.
- Appeals
- 21/08/2023_Pre-notification of appeal
- 21/08/2023_Appeal Form
- 21/08/2023_Appeal Form and Additional Plans
- 08/09/2023_PINS - Start Letter
- 27/09/2023_Appeal Comment - HSE
- 16/10/2023_Ketchin A - 955312 - INTERESTED PARTY
- 16/10/2023_Ketchin A - 955312 - INTERESTED PARTY_(ATTACHMENT) - Andy Ketchin submission of objection
- 17/10/2023_Lavinia Brosinovich - Interested Party redacted
- 16/10/2023_Leaver D - 946981 - INTERESTED PARTY
- 16/10/2023_Marchan A - 955391 - INTERESTED PARTY
- 16/10/2023_Vizard M - 954517 - INTERESTED PARTY
- 16/10/2023_Ward S - 955121 - INTERESTED PARTY
- 31/10/2023_Case MAnagement Conference Note
- 14/11/2023_CD1.1 - Application Form
- 14/11/2023_CD1.2 - A11910-D-0001-I1 Location Plan
- 14/11/2023_CD1.3 -A11910-D-0002-I1 Existing Site Plan
- 14/11/2023_CD1.4 - A11910-D-0003-I1 Proposed Site Plan
- 14/11/2023_CD1.5 - A11910-D-0099- I1 Proposed Plan Level B - Co-living LGF
- 14/11/2023_CD1.6 - A11910-D-0100-I1 Proposed Plan Level 0 - Co Living GF and PBSA LGF
- 14/11/2023_CD1.7 - A11910-D-0101-I1 Proposed Plan Level 1 - Co-living 1F and PBSA GF
- 14/11/2023_CD1.8 - A11910-D-0102-I1 Proposed Plan Level 2 - Co-living 2F and PBSA 1F
- 14/11/2023_CD1.9 - A11910-D-0103-I1 Proposed Plan Level 3 - Co-living 3F and PBSA 2F
- 14/11/2023_CD1.10 - A11910-D-0104-I1 Proposed Plan Level 4 - Co-living 4F and PBSA 3F
- 14/11/2023_CD1.11 - A11910-D-0105-I1 Proposed Plan Level 5 - Co-living 5F and PBSA 4F
- 14/11/2023_CD1.12 - A11910-D-0106-I1 Proposed Plan Level 6 - Co-living 6F and PBSA 4F
- 14/11/2023_CD1.13 - A11910-D-0107-I1 Proposed Plan Level 7 - Roof
- 14/11/2023_CD1.14 - A11910-D-0201-I1 Proposed Elevations A1 and A2
- 14/11/2023_CD1.15 - A11910-D-0202-I1 Proposed Elevations B1 and B2
- 14/11/2023_CD1.16 - A11910-D-0203-I1 Proposed Elevations C and D
- 14/11/2023_CD1.17 - A11910-D-0204-I1 Proposed Elevations E and F
- 14/11/2023_CD1.18 - A11910-D-0300-I1 Proposed Site Context Sections
- 14/11/2023_CD1.19 - A11910-D-0301-I1 Proposed Sections AA and BB
- 14/11/2023_CD1.20 - A11910-D-0302-I1 Proposed Sections CC
- 14/11/2023_CD1.21 - A11910-D-0303-I1 Proposed Sections DD
- 14/11/2023_CD1.22 - A11910-D-0304-I1 Proposed Sections EE
- 14/11/2023_CD1.23 - A11910-F-0100-I1 Existing Ground Floor Plan
- 14/11/2023_CD1.24 - A11910-F-0101-I1 Existing Basement, 1st, 2nd, 3rd and 4th Floor Plans
- 14/11/2023_CD1.25 - A11910-F-0200-I1 Existing AA BB Elevations
- 14/11/2023_CD1.26 - A11910-F-0201-I1 Existing CC DD Elevations
- 14/11/2023_CD1.27 - A11910-F-0300-I1 Existing EE FF GG Sections
- 14/11/2023_CD1.28 - A11910-S-0003-P1 Proposed Fire Service Site Plan
- 14/11/2023_CD1.29 - A11910-W-0001-I1 Proposed Site Plan (with bus lane)
- 14/11/2023_CD1.30 - 072032.100-CUR-00-XX-RP-GE-0001_V02 Phase 1&2 Ground Investigation Report
- 14/11/2023_CD1.31 - 072032-CUR-XX-XX-RP-00001-V04-FRA&DS Flood Risk Assessment and Sustainable Drainage Strategy
- 14/11/2023_CD1.32 - 20-1724.01 Air Quality Assessment
- 14/11/2023_CD1.33 - 210923 - Utilities Report
- 14/11/2023_CD1.34 - 210924 - Energy and Sustainability Statement
- 14/11/2023_CD1.35 - 31257 201216 BREEAM 2018 Pre-assessment Statement
- 14/11/2023_CD1.36 - 31257 201216 BREEAM 2018 Pre-assessment Tracker
- 14/11/2023_CD1.37 - 72032-CUR-00-XX-RP-TP-002-V02-TA Transport Assessment
- 14/11/2023_CD1.38 - 72032-CUR-00-XX-RP-TP-002-V02-TA Transport Assessment Drawings
- 14/11/2023_CD1.39 - 72032-CUR-00-XX-RP-TP-002-V02-TA Transport Assessment Appendices
- 14/11/2023_CD1.40 - 72032-CUR-00-XX-RP-TP-003-V02-FTP Framework Travel Plan
- 14/11/2023_CD1.41 - TH-A780-1120v1.2 Arboricultural Impact Assessment
- 14/11/2023_CD1.42 - Co-living Management Plan
- 14/11/2023_CD1.43 - Ecological Appraisal and Phase 1 Bat Report
- 14/11/2023_CD1.44 - Fire Statement Form Rev 00
- 14/11/2023_CD1.45 - Heritage Assessment
- 14/11/2023_CD1.46 - Noise and Acoustic Technical Note
- 14/11/2023_CD1.47 - 211005 Design and Acccess Statement
- 14/11/2023_CD1.48 - RD0002 Oct 2021 Planning Statement and Statement of Community Involvement
- 14/11/2023_CD1.49 - Management Plan
- 14/11/2023_CD2.1.1 - A11910-D-0099-I2 Proposed Plan Level B - Co-living LGF
- 14/11/2023_CD2.1.2 - A11910-D-0100-I2 Proposed Plan Level 0 - Co-living GF and PBSA LGF
- 14/11/2023_CD2.1.3 - A11910-D-0101-I2 Proposed Plan Level 1 - Co-living 1F and PBSA GF
- 14/11/2023_CD2.1.4 - A11910-D-0102-I2 Proposed Plan Level 2 - Co-living 2F and PBSA 1F
- 14/11/2023_CD2.1.5 - A11910-D-0103-I2 Proposed Plan Level 3 - Co-living 3F and PBSA 2F
- 14/11/2023_CD2.1.6 - A11910-D-0104-I2 Proposed Plan Level 4 - Co-living 4F and PBSA 3F
- 14/11/2023_CD2.1.7 - A11910-D-0105-I2 Proposed Plan Level 5 - Co-living 5F and PBSA 4F
- 14/11/2023_CD2.1.8 - A11910-D-0106-I2 Proposed Plan Level 6 - Co-living 6F and PBSA 5F
- 14/11/2023_CD2.1.9 - A11910-D-0107-I2 Proposed Plan Level 7 - Roof
- 14/11/2023_CD2.1.10 - Exeter Coliving_21.12.01 Co-living Accommodation and Area Schedule
- 14/11/2023_CD2.1.11 - Exeter PBSA_21.12.01 PBSA Accommodation and Area Schedule
- 14/11/2023_CD2.2.1 - 5519-OOB-XX-XX-SK-L-0005 Landscape Site Plan
- 14/11/2023_CD2.2.2 - 5519-OOB-XX-XX-SK-L-0006 Planting Plan
- 14/11/2023_CD2.2.3 - 5519-OOB-XX-XX-SK-L-0007 Trees Plan
- 14/11/2023_CD2.2.4 - A11910-D-0301-I2 Proposed Sections AA and BB
- 14/11/2023_CD2.2.5 - A11910-D-0302-I2 Proposed Sections CC
- 14/11/2023_CD2.2.6 - A11910-D-0303-I2 Proposed Sections DD
- 14/11/2023_CD2.2.7 - A11910-D-0304-I2 Proposed Sections EE
- 14/11/2023_CD2.2.8 - A11910-D-0003-I2 Proposed Site Plan
- 14/11/2023_CD2.2.9 - A11910-D-0004-I1 Phasing Plan
- 14/11/2023_CD2.2.10 - A11910-D-0005-I1 Setting Out Plan
- 14/11/2023_CD2.2.11 - A11910-D-0006-I1 Proposed Site Plan (with bus lane)
- 14/11/2023_CD2.2.12 - Lightwells and Courtyards
- 14/11/2023_CD2.2.13 - A11910-D-0099-I2 Proposed Plan Level B - Co-living LGF
- 14/11/2023_CD2.2.14 - A11910-D-0100-I2 Proposed Plan Level 0 - Co-living GF and PBSA LGF
- 14/11/2023_CD2.2.15 - A11910-D-0101-I2 Proposed Plan Level 1 - Co-living 1F and PBSA GF
- 14/11/2023_CD2.2.16 - A11910-D-0102-I2 Proposed Plan Level 2 - Co-living 2F and PBSA 1F
- 14/11/2023_CD2.2.17 - A11910-D-0103-I2 Proposed Plan Level 3 - Co-living 3F and PBSA 2F
- 14/11/2023_CD2.2.19 - A11910-D-0104-I2 Proposed Plan Level 4 - Co-living 4F and PBSA 3F
- 14/11/2023_CD2.2.20 - A11910-D-0105-I2 Proposed Plan Level 5 - Co-living 5F and PBSA 4F
- 14/11/2023_CD2.2.21 - A11910-D-0106-I2 Proposed Plan Level 6 - Co-living 6F and PBSA 5F
- 14/11/2023_CD2.2.22 - A11910-D-0107-I2 Proposed Plan Level 7 - Roof
- 14/11/2023_CD2.3.1 - A11910-D-0003-I4 Site Plan Proposed
- 14/11/2023_CD2.3.2 - A11910-D-0004-I3 Phasing Plan
- 14/11/2023_CD2.3.3 - A11910-D-0005-I3 Setting Out Based on Current Stage 2 Design Info
- 14/11/2023_CD2.3.4 - A11910-D-0099-I4 Proposed Level B - Co-living LGF
- 14/11/2023_CD2.3.5 - A11910-D-0100-I4 Proposed Level 0 - Co-living GF and PBSA LGF
- 14/11/2023_CD2.3.6 - A11910-D-0101-I4 Proposed Level 1 - Co-living 1F and PBSA GF
- 14/11/2023_CD2.3.7 - A11910-D-0102-I4 Proposed Level 2 - Co-living 2F and PBSA 1F
- 14/11/2023_CD2.3.8 - A11910-D-0103-I4 PRoposed Level 3 - Co-living 3F and PBSA 2F
- 14/11/2023_CD2.3.9 - A11910-D-0104-I4 Proposed Plan Level 4 - Co-living 4F and PBSA 3F
- 14/11/2023_CD2.3.10 - A11910-D-0105-I4 Proposed Plan Level 5 - Co-living 5F and PBSA 4F
- 14/11/2023_CD2.3.11 - A11910-D-0106-I4 Proposed Plan Level 6 - Co-living 6F and PBSA 5F
- 14/11/2023_CD2.3.12 - A11910-D-0107-I4 Proposed Plan Level 7 - Roof
- 14/11/2023_CD2.3.13 - A11910-D-0201-I2 Elevations A1 and A2 Proposed
- 14/11/2023_CD2.3.14 - A11910-D-0202-I2 Elevations B1 and B2 Proposed
- 14/11/2023_CD2.3.15 - A11910-D-0203-I2 Elevations C and D Proposed
- 14/11/2023_CD2.3.16 - A11910-D-0204-I2 Elevations E and F Proposed
- 14/11/2023_CD2.3.17 - A11910-D-0300-I3 Site Context Sections Proposed
- 14/11/2023_CD2.3.18 - A11910-D-0301-I3 Sections AA and BB Proposed
- 14/11/2023_CD2.3.19 - A11910-D-0302-I3 Sections CC Proposed
- 14/11/2023_CD2.3.20 - A11910-D-0303-I3 -Sections DD Proposed
- 14/11/2023_CD2.3.21 - A11910-D-0304-I3 Sections EE Proposed
- 14/11/2023_CD2.3.22 - 5519-OOB-XX-XX-DR-L-0001 Co-Living Courtyard
- 14/11/2023_CD2.3.23 - 5519-OOB-XX-XX-DR-L-0002 Green Link
- 14/11/2023_CD2.3.24 - 5519-OOB-XX-XX-DR-L-0003 PBSA Courtyard 1
- 14/11/2023_CD2.3.25 - 5519-OOB-XX-XX-DR-L-0004 PBSA Courtyard 2
- 14/11/2023_CD2.3.26 - 5519-OOB-XX-XX-SK-L-0005 - Sketch Site Plan
- 14/11/2023_CD2.3.27 - 5519-OOB-XX-XX-SK-L-0006 - Planting Plan
- 14/11/2023_CD2.3.28 - 5519-OOB-XX-XX-SK-L-0007 - Tree Plan
- 14/11/2023_CD2.3.29 - 72032-CUR-XX-00-D-TP-75007-P02 Pedestrian and Vehicular Access Arrangement
- 14/11/2023_CD2.3.30 - A11910-D-0101-I4 Proposed Plan Level 1 - Co-living 1F and PBSA GF
- 14/11/2023_CD2.3.32 - SC0005 Schedule of Plans 2
- 14/11/2023_CD2.3.33 - Amendment Summary Document Part 1
- 14/11/2023_CD2.3.34 - Amendment Summary Document Part 2
- 14/11/2023_CD2.3.36 - Exeter PBSA Schedule 2022.06.16 PBSA Schedule
- 14/11/2023_CD2.4.1 - 220802 A11910 HSE Architectural response
- 14/11/2023_CD2.4.2 - A11910-D-0099-I5 Proposed Plan Level B - Co-living LGF
- 14/11/2023_CD2.4.3 - A11910-D-0100-I5 Proposed Plan Level 0 - Co-living GF and PBSA LGF
- 14/11/2023_CD2.4.5 - A11910-D-0101-I5 Proposed Plan Level 1 - Co-living 1F and PBSA GF
- 14/11/2023_CD2.4.6 - A11910-D-0102-I5 Proposed Plan Level 2 - Co-living 2F and PBSA GF
- 14/11/2023_CD2.4.7 - A11910-D-0103-I5 Proposed Plan Level 3 - Co-living 3F and PBSA 2F
- 14/11/2023_CD2.4.8 - A11910-D-0104-I5 Proposed Plan Level 4 - Co-living 4F and PBSA 3F
- 14/11/2023_CD2.4.9 - A11910-D-0105-I5 Proposed Plan Level 5 - Co-living 5F and PBSA 4F
- 14/11/2023_CD2.4.10 - A11910-D-0106-I5 Proposed Plan Level 6 - Co-living 6F and PBSA 5F
- 14/11/2023_CD2.4.11 - A11910-S-0003-P2 Fire Service Site Plan Proposed
- 14/11/2023_CD2.2.23 - SC0002 Schedule of Reports and Plans
- 14/11/2023_CD2.5.1 - A11910-D-0003-I5 Site Plan Proposed
- 14/11/2023_CD2.5.2 - A11910-D-0004-I4 Phasing Plan
- 14/11/2023_CD2.5.3 - A11910-D-0005-I4 Setting out Stage 2 design
- 14/11/2023_CD2.5.4 - A11910-D-0099-I8 Proposed plan level B - Co-living LGF
- 14/11/2023_CD2.5.5 - A11910-D-0100-I9 Proposed Plan Level 0 - Co-living GF and PBSA LGF
- 14/11/2023_CD2.5.6 - A11910-D-0101-I8 Proposed Plan Level 1 - Co-living 1F and PBSA GF
- 14/11/2023_CD2.5.7 - A11910-D-0102-I8 Proposed Plan Level 2 - Co-living 2F and PBSA 1F
- 14/11/2023_CD2.5.8 - A11910-D-0103-I7 Proposed Plan Level 3 - Co-living 3F and PBSA 2F
- 14/11/2023_CD2.5.9 - A11910-D-0104-I7 Proposed Plan Level 4 - Co-living 4F and PBSA 3F
- 14/11/2023_CD2.5.10 - A11910-D-0105-I7 Proposed Plan Level 5 - Co-living 6F and PBSA 4F
- 14/11/2023_CD2.5.11 - A11910-D-0106-I7 Proposed Plan Level 6 - Co-living 6F and PBSA 5F
- 14/11/2023_CD2.5.12 - A11910-D-0107-I6 Proposed plan level 7 - Roof
- 14/11/2023_CD2.5.13 - A11910-D-0201-I4 Elevations A1 and A2 Proposed
- 14/11/2023_CD2.5.14 - A11910-D-0202-I4 Elevations B1 and B2 Proposed
- 14/11/2023_CD2.5.15 - A11910-D-0203-I4 Elevations C and D Proposed
- 14/11/2023_CD2.5.16 - A11910-D-0204-I4 Elevations E and F Proposed
- 14/11/2023_CD2.5.17 - A11910-D-0300-I4 Site Context Sections Proposed
- 14/11/2023_CD2.5.18 - A11910-D-0301-I5 Sections AA & BB Proposed
- 14/11/2023_CD2.5.19 - A11910-D-0302-I5 Sections CC Proposed
- 14/11/2023_CD2.5.20 - A11910-D-0303-I5 Sections DD Proposed
- 14/11/2023_CD2.5.21 - A11910-D-0304-I5 Section EE Proposed
- 14/11/2023_CD2.5.22 - A11910-S-0003-P3 Fire Service Plan Proposed
- 14/11/2023_CD2.5.23 - Exeter Coliving Schedule 2022.02.17
- 14/11/2023_CD2.5.24 - Exeter PBSA Schedule
- 14/11/2023_CD2.5.25 - 5519-OOB-XX-XX-DR-L-0005 P13 Landscape Site Plan
- 14/11/2023_CD2.5.26 - 5519-OOB-XX-XX-DR-L-0006 P13 Planting Plan
- 14/11/2023_CD2.5.27 - 5519-OOB-XX-XX-SK-L-0007 P14 Tree Plan
- 14/11/2023_CD2.5.28 - 5519-OOB-XX-XX-SK-L-900 _P04 Co-living Courtyard
- 14/11/2023_CD2.5.29 - 5519-OOB-XX-XX-SK-L-9003_P04_PBSA Courtyard
- 14/11/2023_CD2.5.30 - A11910_Heavitree Road DAS Addendum_LR
- 14/11/2023_CD2.5.31 5519-OOB-XX-XX-SK-L-9002 P04 Green Link
- 14/11/2023_CD2.6.2 - A11910-D-0101-I9 Proposed Plan Level 1 - Co-living 1F and PBSA GF
- 21/11/2023_CD2.6.3 - A11910-D-0102-I9 Proposed Plan Level 2 - Co-living 2F and PBSA FF
- 21/11/2023_CD2.6.4 - A11910-D-0103-I8 Proposed Plan Level 3 - Co-living 3F and PBSA 2F
- 21/11/2023_CD2.6.5 - A11910-D-0104-I8 Proposed Plan Level 4 - Co-living 4F and PBSA 3F
- 21/11/2023_CD2.6.6 - A11910-D-0105-I9 Proposed Plan Level 5 - Co-living 5F and PBSA 4F
- 21/11/2023_CD2.6.7 - A11910-D-0106-I8 Proposed Plan Level 6 - Co-living 6F and PBSA 5F
- 21/11/2023_CD3.1.1 - Planning committee Report 05-09-2022
- 21/11/2023_CD3.1.2 - Planning committee Minutes 05-09-2022
- 21/11/2023_CD3.1.3 - Planning committee report 10-10-2022
- 21/11/2023_CD3.1.4 - Planning committee Minutes 10-10-2022
- 21/11/2023_CD3.1.5 - Planning committee report 20-02-2023
- 21/11/2023_CD3.1.6 - Planning committee minutes 20-02-2023
- 21/11/2023_CD4.1 - Exeter Core Strategy
- 21/11/2023_CD2.6.1 - A11910-A-S0001P1 - PBSA Accommodation Schedule
- 21/11/2023_CD4.2 - Exeter Local Plan First Review Appendices
- 21/11/2023_CD4.2 - Exeter Local Plan First Review City Centre Inset Map
- 21/11/2023_CD4.2 - Exeter Local Plan First Review
- 21/11/2023_CD7.1.1 - Residential Design Guide SPD
- 21/11/2023_CD7.1.2 - Trees in Relation to Development SPD
- 21/11/2023_CD7.1.3 - National Design Guide (2021)
- 21/11/2023_CD7.1.4 - Manual for Streets
- 21/11/2023_CD7.1.5 - Liveable Exeter Key Site - East Gate
- 21/11/2023_CD7.1.5 - Liveable Exeter Principles
- 21/11/2023_CD7.1.6 - 2021 Exeter Density Study
- 21/11/2023_CD7.1.7 - Exeter Plan Full Draft Regulation 18 October 2023
- 21/11/2023_CD7.1.8 - Listed Buildings Quick List
- 21/11/2023_CD7.1.9 - Lower Summerlands Conservation Area Appraisal and Management Plan
- 21/11/2023_CD7.1.10 - Mont Le Grand Conservation Area Appraisal and Management Plan
- 21/11/2023_CD7.1.11 - St Leonards Conservation Area Appraisal and Management Plan
- 21/11/2023_CD7.1.12 - Local Plan Saved Policies List
- 21/11/2023_CD7.1.13 - NPPG - Build to Rent
- 21/11/2023_CD7.1.14 - Exeter First Homes Policy Statement (June 2021)
- 21/11/2023_CD7.1.15 - University SPG
- 21/11/2023_CD7.1.16 - 5 Year Housing Land Supply Statement May 2023
- 21/11/2023_CD7.1.7 - Planning (Listed Building and Conservation Areas) Act 1990
- 21/11/2023_CD7.1.8 - Planning and Compulsary Purchase Act 2004
- 21/11/2023_CD7.1.9 - The Community Infrastructure Levy Regulations 2010
- 21/11/2023_CD7.1.20 - National Planning Policy Guidance (NPPG)
- 21/11/2023_CD7.1.21 - PPG17 Companion Guide
- 21/11/2023_CD7.7.8 - Unlocking Social Housing How to fix the rules that are holding back building
- 21/11/2023_CD7.7.10 - Shelter Briefing Cost of living crisis and the housing emergency
- 21/11/2023_CD7.7.11 - Fixing our Broken Housing Market - Housing White Paper (Feb 2017)
- 21/11/2023_CD7.7.12 - Bleak Houses - Tackling the crisis of family homelessness in england - Childrens Commissioner (August 2019)
- 21/11/2023_CD7.7.13 - Denied the right to a safe home - Exposing the housing emergency - Shelter (May 2021)
- 21/11/2023_CD7.8.1.1 - LPA Proof of Evidence
- 21/11/2023_CD7.8.1.1 - LPA Summary Proof of Evidence
- 21/11/2023_CD7.8.1.2 - LPA Design Proof of Evidence Appendicies
- 21/11/2023_CD7.8.1.2 - LPA Design Proof of Evidence
- 21/11/2023_CD7.8.1.2 - Summary LPA Design Proof of Evidence
- 21/11/2023_CD7.8.2.1 - POE0001 Gareth Hooper Summary Proof of Evidence
- 21/11/2023_CD7.8.2.1 - POE0001 Gareth Hooper Planning Proof of Evidence
- 21/11/2023_CD7.8.2.1 - POE0001 Gareth Hooper Planning Proof Cover Sheet
- 21/11/2023_CD7.8.2.1 - POE0001 Gareth Hooper Appendices
- 21/11/2023_CD7.8.2.2 - 0809-03.RPT.M23 Affordable Housing Summary Proof of Evidence
- 21/11/2023_CD7.8.2.2 - 0809-03.RPT.M23 Affordable Housing Proof of Evidence
- 21/11/2023_CD7.8.2.2 - 0809-03.RPT.M23 Affordable Housing Appendices
- 21/11/2023_CD7.8.2.2 - 0809-03.RPT.M23 Affordable Housing Appeal and Court Judgement Cover Sheet
- 21/11/2023_7.8.2.3 - Chris Miele Executive Summary (Heritage and Townscape)
- 21/11/2023_CD7.8.2.3 - Chris Miele Proof of Evidence (Heritage and Townscape)
- 21/11/2023_CD7.8.2.3 - Chris Miele Appendices (Heritage and Townscape)
- 21/11/2023_CD7.8.2.3 - Nenad Manasijevic (Architecture Setting and Design)
- 21/11/2023_CD7.8.2.3 - Nenad Manasijevic Appendix Design Evolution (Architecture Setting and Design)
- 21/11/2023_CD7.8.2.4 - FLAC 43-1027 Julian Forbes-Laird Vol.1 - Summary and Proof of Evidence (Arboriculture)
- 21/11/2023_CD7.8.2.4 - FLAC 43-1027 Julian Forbes-Laird Vol.2 - Appendices (Arboriculture)
- 21/11/2023_CD7.8.2.5 - Jim Phillips Proof of Evidence (Open Space)
- 21/11/2023_CD7.8.2.5 - Jim Phillips Summary Proof of Evidence (Open Space)
- 21/11/2023_CD7.8.2.6 - Nick Lane Proof of Evidence (Daylight and Sunlight)
- 21/11/2023_CD7.8.2.6 - Nick Lane Appeal Cover Sheet (Daylight and Sunlight)
- 22/11/2023_CD2.6.1 - A11910-A-S0001-P1 Accommodation and Area Schedule
- 22/11/2023_CD2.7.1 List of all plans, drawings and documents submitted with the application
- 22/11/2023_CD2.7.2 - List of Plans and Documents on which the application was decided
- 22/11/2023_CD5.1 - 51-56 Manor Road and 53-55 Drayton Green Road, West Ealing, London (29 October 2021)
- 22/11/2023_CD5.2 - Hawkhurst, Kent (22 March 2022)
- 22/11/2023_CD5.3 - Land off Spruce Close, Exeter (August 2022)
- 22/11/2023_CD5.4 - Land to the west of Clyst Road, Topsham (October 2022)
- 22/11/2023_CD5.5 - Land at the site of the former North Worcestershire Golf Club Ltd, Hanging Lane, Birmingham (APP.P4605.W.18.3192918)
- 22/11/2023_CD5.6 - Oxford Brookes University, Wheatley Campus (APP.Q3115.W.19.3230827)
- 22/11/2023_CD5.7 - Land at Chiswick roundabout, Junction of Gunnersbury Avenue, Great West Road, London
- 22/11/2023_CD5.8 - Rectory Farm, Chescombe Road, Yatton, Bristol BS49 4EU (APP.D0121.W.21.3286677)
- 22/11/2023_CD5.9 - Land south of Clappers Lane, Earnley, West Sussex, PO20 7JJ (APP.L3815.W.22.3291160)
- 22/11/2023_CD5.10 - The Whitechapel Estate Masterplan (APP.E5900.W.17.3171437)
- 22/11/2023_CD5.11 - Land at Burgess Business Park, Parkhouse Street, London, SE5 7TJ
- 22/11/2023_CD5.12 - Land south of Kingfield Road and east of Westfield Avenue, Westfield, Woking, GU22 9PF
- 22/11/2023_CD5.13 - Land at 8 Albert Embankment (APP.N5660.V.20.3254203 & APP.N5660.V.20.3257106)
- 22/11/2023_CD6.1 - CC Construction Limited v Secretary for the Environment and Carrick District Council, (1995) 69 P&CR 51
- 22/11/2023_CD6.2 - R v Tower Hamlets 2000London District Council, ex parte Barratt Homes Ltd [2000] JPL 1050
- 22/11/2023_CD6.3 - Mitchell v Secretary of State for the Environment and Another, (1995) 69 P&CR 60
- 22/11/2023_CD7.1.22 - PPG15 Historic Environment
- 22/11/2023_CD7.1.23 - ECC Corporate Plan 2022-2026
- 22/11/2023_CD7.1.24 - ECC Housing Strategy 2023-2027
- 22/11/2023_CD7.1.25 - Exeter Housing Market Area Strategic Housing Market Assessment 2015
- 22/11/2023_CD7.1.26 - Five Year Housing Land Supply Statement (May 2023)
- 22/11/2023_CD7.1.27 - ECC Annual Monitoring Report 2021-22
- 22/11/2023_CD7.1.28 - Affordable Housing SPD
- 22/11/2023_CD7.1.29 - Draft Exeter Housing Strategy
- 22/11/2023_CD7.1.30 - Homelessness and Rough Sleeping Prevention Strategy 2023-2027
- 22/11/2023_CD7.1.31 - National Housing Strategy
- 22/11/2023_CD7.1.32 - Devon Home Choice Quarterly Monitoring Report (April 2023)
- 22/11/2023_CD7.1.33 - Co-living and the Exeter Economy’ (October 2020)
- 22/11/2023_CD7.1.35 - 2022 Exeter Housing and Economic Land Availability Assessment
- 22/11/2023_CD7.1.36 - 2020 Exeter Brownfield Study
- 22/11/2023_CD7.1.37 - 2020 Exeter Urban Capacity Study
- 22/11/2023_CD7.1.39 - Knight Frank’s up-to-date PBSA projections for Exeter
- 22/11/2023_CD7.1.40 - Existing and Proposed Statutory Designations Plan
- 22/11/2023_CD7.1.42 - Public Open Space SPD
- 22/11/2023_CD7.1.43 - Audit of Outdoor Recreation Facilities
- 22/11/2023_CD7.1.44 - Audit of Outdoor Recreation Facilities Appendices
- 22/11/2023_CD7.7.01 - Freedom of Information (“FOI”) request submitted to Exeter City
- 22/11/2023_CD7.7.02 - House of Commons Debate (24 October 2013)
- 22/11/2023_CD7.7.03 - Newtown Open Space Map
- 22/11/2023_CD7.7.04 - State of UK Public Parks 2021
- 22/11/2023_CD7.7.05 - Officers Report 19.1417.FUL – The Former Ambulance Station
- 22/11/2023_CD7.7.06 - Officers Report - 191556FUL - Harlequins Centre
- 22/11/2023_CD7.7.07 - BRE Site Layout and Planning for Daylight and Sunlight
- 22/11/2023_CD7.7.09 - House of Commons ‘Rising Cost of living in the UK’ (November 2022)
- 22/11/2023_CD7.7.14 - HEAN 3 The Setting of Heritage Assets
- 22/11/2023_CD7.7.15 - BS5837 2012
- 22/11/2023_CD7.7.16 - BRE. Guide 209 2022 Edition
- 22/11/2023_CD7.7.17 - large-scale Purpose-built Shared Living
- 22/11/2023_CD7.10.1 - Interested Party Correspondence - A. Ketchin 2
- 22/11/2023_CD7.10.1 - Interested Party Correspondence - A. Ketchin
- 22/11/2023_CD7.10.2 - Interested Party Correspondence – L. Brosivonich
- 22/11/2023_CD7.10.3 - Interested Party Correspondence – D. Leaver
- 22/11/2023_CD7.10.4 - Interested Party Correspondence – A. Marchan
- 22/11/2023_CD7.10.5 - Interested Party Correspondence – Cllr M. Vizard
- 22/11/2023_CD7.10.6 - Interested Party Correspondence – S.Ward
- 22/11/2023_CD7.2.1.1 Arboricultural Comment
- 22/11/2023_CD7.2.1.2 Consultation Response - DCC (Highway Authority) 21_1564_OUT
- 22/11/2023_CD7.2.1.3 Consultation Response (Revised) - DCC (LLFA) FRM
- 22/11/2023_CD7.2.1.4 Devon and Somerset Fire Service Comment
- 22/11/2023_CD7.2.1.5 Devon Buildings Group
- 22/11/2023_CD7.2.1.6 Environmental Health Officer
- 22/11/2023_CD7.2.1.7 Exeter Airport
- 22/11/2023_CD7.2.1.8 Exeter Civic Society
- 22/11/2023_CD7.2.1.9 Exeter Cycling Campaign Comment
- 22/11/2023_CD7.2.1.10 Heritage Response
- 22/11/2023_CD7.2.1.11 LLFA
- 22/11/2023_CD7.2.1.12 Local Plans Team
- 22/11/2023_CD7.2.1.13 Natural England Comment
- 22/11/2023_CD7.2.1.14 NHS
- 22/11/2023_CD7.2.1.15 pgo-0911 (HSE Substantive Response) LPA REF 21_1564_OUT
- 22/11/2023_CD7.2.1.16 Police Designing Out Crime Comment
- 22/11/2023_CD7.2.1.17 Public and Green Spaces Team
- 22/11/2023_CD7.2.1.18 Revised Tree Response
- 22/11/2023_CD7.2.1.19 RSPB Response
- 22/11/2023_CD7.2.1.20 South West Water Comment
- 22/11/2023_CD7.2.1.21 Waste Planning
- 22/11/2023_CD7.2.2.1 Design Review Response
- 22/11/2023_CD7.2.2.2 Devon Somerset Fire Rescue Service
- 22/11/2023_CD7.2.2.3 Exeter Airport 30.06.2022
- 22/11/2023_CD7.2.2.4 Exeter Civic Society
- 22/11/2023_CD7.2.2.5 Exeter Cycling Campaign
- 22/11/2023_CD7.2.2.6 Heavitree Road_DRP_Feedback_18_02_21
- 22/11/2023_CD7.2.2.7 Living Options Devon
- 22/11/2023_CD7.2.2.8 Local Highways Authority
- 22/11/2023_CD7.2.2.9 Natural England
- 22/11/2023_CD7.2.2.10 NHS Devon
- 22/11/2023_CD7.2.2.11 NHS
- 22/11/2023_CD7.2.2.12 pgo-1732 (HSE Substantive Response) LPA REF 21_1564_OUT
- 22/11/2023_CD7.2.2.13 Police Designing Out Crime Officer
- 22/11/2023_CD7.2.2.14 Public and Green Spaces Team
- 22/11/2023_CD7.2.2.15 RSPB
- 22/11/2023_CD7.2.2.16 South West Water
- 22/11/2023_CD7.2.2.17 Tree Manager
- 22/11/2023_CD7.2.3.1 Civic Society - Objection withdrawn
- 22/11/2023_CD7.2.3.2 Civic Society
- 22/11/2023_CD7.2.3.3 Devon Somerset Fire Rescue Service
- 22/11/2023_CD7.2.3.4 Environmental Health
- 22/11/2023_CD7.2.3.5 Exeter Cycling Campaign
- 22/11/2023_CD7.2.3.6 Exeter Highways Authority
- 22/11/2023_CD7.2.3.7 Exeter International Airport
- 22/11/2023_CD7.2.3.8 Heritage
- 22/11/2023_CD7.2.3.9 HSE Email
- 22/11/2023_CD7.2.3.10 HSE
- 22/11/2023_CD7.2.3.11 Living Options Devon
- 22/11/2023_CD7.2.3.12 LLFA updated comment
- 22/11/2023_CD7.2.3.13 LLFA
- 22/11/2023_CD7.2.3.14 Natural England
- 22/11/2023_CD7.2.3.15 NHS Devon
- 22/11/2023_CD7.2.3.16 NHS updated comment
- 22/11/2023_CD7.2.3.17 Police Designing Out Crime Officer
- 22/11/2023_CD7.2.3.18 RSPB
- 22/11/2023_CD7.2.3.19 South West Water
- 22/11/2023_CD7.2.3.20 Tree Manager
- 22/11/2023_CD7.2.3.21 UD
- 22/11/2023_CD7.2.3.22 Waste Planning Authority
- 22/11/2023_CD7.2.3.23 Waste Recyling Team
- 01/12/2023_CD7.4 - Appellant - Statement of Case
- 01/12/2023_CD7.4 - Appellant - Statement of Case APPENDIX 2 Heavitree Road DS report - August 23
- 01/12/2023_CD7.4 - Appellant - Statement of Case APPENDIX 3
- 01/12/2023_CD7.5 - LPA Statement of Case
- 01/12/2023_CD7.5 - LPA Statement of Case Appendix 1 - Core Strategy Objective 1
- 01/12/2023_CD7.5 - LPA Statement of Case Appendix 2 - Core Strategy Policy CP4 (Density)
- 01/12/2023_CD7.5 - LPA Statement of Case Appendix 3 - Exeter Local Plan First Review City Centre Inset Map
- 01/12/2023_CD7.5 - LPA Statement of Case Appendix 4 - 2021 Exeter Density Study
- 01/12/2023_CD7.5 - LPA Statement of Case Appendix 5 - 5 Year Housing Land Supply Statement May 2023
- 01/12/2023_CD7.5 - LPA Statement of Case Appendix 6 - Exeter Student Numbers (Saved 13 October 2023)
- 01/12/2023_CD7.5 - LPA Statement of Case Appendix 7 - List of Documents
- 13/12/2023_CD7.12.5 - Statement of Common Ground - Reasons for Refusal
- Application Details
- 07/10/2021_Air Quality Assessment 20-1724.01_REP_Heavitree Road Exeter_AIR_23SEP2021
- 07/10/2021_Transport Assessment Drawings Part 2 72032-CUR-00-XX-RP-TP-002-V02-TA (Part 2 of 3)
- 07/10/2021_Transport Assessment Part 3 72032-CUR-00-XX-RP-TP-002-V02-TA (Part 3 of 3)
- 07/10/2021_Superseded Flood Risk Assessment and Sustainable Drainage Strategy 072032-CUR-XX-XX-RP-00001-V04-FRADS
- 07/10/2021_Co-living Management Plan
- 07/10/2021_210923 - Utilities Report
- 07/10/2021_Framework Travel Plan 72032-CUR-00-XX-RP-TP-003-V02-FTP
- 07/10/2021_Energy and Sustainability Statement 210924 - Heavitree Road Student Exeter
- 07/10/2021_Transport Assessment Part 1 72032-CUR-00-XX-RP-TP-002-V02-TA (Part 1 of 3)
- 07/10/2021_SUPERSEDED Arboricultural Appraisal A780_Heavitree_Police_Station_BS5837_v1-2_Arb_Report_24092021
- 07/10/2021_Ecological Appraisal and Phase 1 Bat Report FINAL
- 07/10/2021_Fire Statement Form Heavitree Road Exeter rev 00
- 07/10/2021_SUPERSEDED Heritage Assessment Heavitree Road Exeter
- 07/10/2021_Noise and Acoustic Technical Note Heavitree Road Exeter
- 07/10/2021_Student Roost Management Plan vSep-21
- 07/10/2021_BREEAM 2018 Pre-assessment Tracker 31257 201216 Heavitree Student Building -
- 07/10/2021_BREEAM 2018 Pre-assessment Statement 31257 201216 Heavitree Student Building -
- 07/10/2021_Planning Statement and Statement of Community Involvement Heavitree Road 051021 R0002 Draft
- 07/10/2021_L0001 Cover Letter
- 07/10/2021_N0001 Draft Heads of Terms - Exeter
- 07/10/2021_CIL Form 1 -Additional Information CF0003 CIL Form
- 07/10/2021_SC0001 Schedule of Reports Heavitree Road
- 07/10/2021_Application Form
- 08/10/2021_Design and Access Statement
- 08/10/2021_Phase 1 PRA and Phase 2 Ground Investigation Report
- 19/10/2021_Email to agent enclosing acknowledgement letter
- 05/11/2021_Agent email enclosing Addendum of additional Illustrative Townscape views
- 06/12/2021_Agent email enclosing further documents
- 06/12/2021_R0003 Statement of Community Involvement
- 06/12/2021_PBSA Benefits Statement Rev B
- 28/01/2022_SUPERSEDED Exeter Coliving Schedule of Accomodation_22.01.26
- 28/01/2022_SUPERSEDED SC0002 Schedule of Reports and Plans Heavitree Road
- 27/01/2022_Agent email relating to revised plans
- 27/12/2021_Additional information re Heavitree Road_Lightwells and Courtyards
- 03/02/2022_Applicants consultant email enclosing additional drainage information in response to DCC (LLFA) consultatiion response
- 22/02/2022_Revised Flood Risk Assessment and Sustainable Drainage Strategy 072032-CUR-XX-XX-RP-00001-V05-FRADS_compressed
- 24/06/2022_SUPERSEDED Heavitree Road Plans & Reports Schedule (DPP Planning)
- 24/06/2022_Revised Plans Cover Letter (DPP, 24.06.2022)
- 24/06/2022_SUPERSEDED Amendment Summary Document Part 1
- 24/06/2022_SUPERSEDED Amendment Summary Document Part 2
- 28/06/2022_SUPERSEDED Heavitree Road Plans & Reports Schedule (DPP Planning)
- 29/06/2022_SUPERSEDED Schedule of Accommodation - Block A - PBSA
- 29/06/2022_SUPERSEDED Schedule of Accommodation - Block B - Co-living
- 09/01/2023_221222 - Heavitree Rd - Planning response-R01.pdf
- 09/01/2023_72032-CUR-00-XX-RP-TP-004-V02-Note.pdf
- 06/01/2023_72032-CUR-XX-XX-RP-C-00002-V02.pdf
- 09/01/2023_REVISED A11910_Heavitree Road_DAS Addendum_LR.pdf
- 09/01/2023_A780_Heavitree_Police_Station_BS5837_v4-0_Arb_Report_20122022.pdf
- 09/01/2023_REVISED CR0564 Heavitree Road Heritage Assessment (update 2022).pdf
- 09/01/2023_DS_Report_-_Heavitree_2021_09_28-merged-compressed.pdf
- 09/01/2023_SUPERSEDED Exeter Coliving Schedule.pdf
- 09/01/2023_Exeter PBSA Schedule.pdf
- 09/01/2023_REVISED Fire Statement Form - Heavitree Road Exeter rev 01 (002).pdf
- 09/01/2023_Heavitree Road Exeter - Letter to Nixon Homes.pdf
- 05/01/2023_L0005 Heavitree Updated December Submission Cover Letter 231222.pdf
- 09/01/2023_Mental Health & Wellbeing Coliving.pdf
- 06/01/2023_SC0005 Schedule of Plans and Reports Heavitree Road.pdf
- 06/01/2023_SC0006 Schedule of Plans and Reports Heavitree Road.pdf
- 20/02/2023_Exeter Coliving Schedule
- ApplicationDetails
- 15/09/2023_Appellant - Draft Statement of Common Ground.pdf
- 15/09/2023_Appellant - Statement of Case APPENDIX 2 Heavitree Road DS report - August 23.pdf
- 15/09/2023_Appellant - Statement of Case APPENDIX 3.pdf
- 15/09/2023_Appellant - Statement of Case.pdf
- 06/12/2023_CD7.1.37 - 2020 Exeter Urban Capacity Study Part 1 ..pdf
- 06/12/2023_CD7.1.38 - 2021 Exeter Urban Capacity Study Part 2.pdf
- 06/12/2023_CD7.1.41 The Exeter Local List .pdf
- 06/12/2023_CD7.11.1 - 0809-05.RPT.M23 Affordable Housing Rebuttal with Appendices.pdf
- 06/12/2023_CD7.11.2 - 231201 Miele Final Exeter Rebuttal Evidence.pdf
- 06/12/2023_CD7.6.3 - AH SoCG.pdf
- 06/12/2023_CD7.9.1 - S106 Agreement -C 4154-8667-0925.pdf
- 06/12/2023_CD7.9.2 - Plan 1 4131-0898-2092.pdf
- 06/12/2023_CD7.11.3 - POE0002v1 GH Planning Rebuttal Proof of Evidence - W APPENDICES.pdf
- 06/12/2023_CD7.9.3 - Plan 2 4143-1641-7356.pdf
- 28/11/2023_CD7.9.4 - 220698 - CIL Compliance Statement plus appendices.pdf
- 12/12/2023_CD7.12.1 - Point in Proof.pdf
- 12/12/2023_CD7.12.2 - Appellants Opening Statement.pdf
- 12/12/2023_CD7.12.3 - Council Opening Statement.pdf
- 12/12/2023_CD7.12.4 - Appeal statement from Mr Chris Dent 2023 12 12.pdf
- 11/12/2023_CD7.6.1 - Statement of Common Ground.pdf
- 11/12/2023_CD7.6.3 - AH Statement of Common Ground.pdf
- 11/12/2023_CD7.6.4 - Daylight and Sunlight Statement of Common Ground.pdf
- 13/12/2023_CD7.6.1 R003.3891CA Heavitree Road Exeter SoCG (07.12.2023) FINAL - SIGNED.pdf
- 13/12/2023_CD7.6.4 Daylight and Sunlight SoCG final_SIGNED with Appendix.pdf
- 13/12/2023_CD5.6 Summary.pdf
- 13/12/2023_CD5.7 Summary.pdf
- 13/12/2023_CD5.8 Summary.pdf
- 13/12/2023_CD5.9 Summary.pdf
- 13/12/2023_CD6.1 Summary.pdf
- 13/12/2023_CD6.2 Summary.pdf
- 13/12/2023_CD6.3 Summary.pdf
- 13/12/2023_CD7.1.13 NPPG Build to Rent Section.pdf
- 13/12/2023_CD7.1.19 CIL Regulations 2010.pdf
- 13/12/2023_CD7.1.22 PPG15 Historic Environment.pdf
- 13/12/2023_CD7.1.26 East Devon Exeter Mid Devon and Teignbridge Local Housing Needs Assessment 2022.pdf
- 13/12/2023_CD7.1.5 Liveable Exeter Key Site East Gate.pdf
- 13/12/2023_CD7.1.5 Liveable Exeter Principles.pdf
- 13/12/2023_CD7.1.7 Exeter Plan Full Draft Regulation 18 October 2023.pdf
- 13/12/2023_CD7.2.3.24 DRP Feedback 3 - Heavitree Road_DRP_Feedback_19_08_21.pdf
- 13/12/2023_CD3.1.6 Planning Committee Minutes 21-1564-OUT 20.02.2023.pdf
- 13/12/2023_CD5.1 Summary.pdf
- 13/12/2023_CD5.10 Summary.pdf
- 13/12/2023_CD5.11 Summary.pdf
- 13/12/2023_CD5.12 Summary.pdf
- 13/12/2023_CD5.13 Summary.pdf
- 13/12/2023_CD5.2 Summary.pdf
- 13/12/2023_CD5.3 Summary.pdf
- 13/12/2023_CD5.4 Summary.pdf
- 13/12/2023_CD5.5 Summary.pdf
- Comments and Objections
- 20/10/2021_Consultation Response - Exeter Airport Airfield Operations Duty Manager
- 28/10/2021_Objection - Julie Jarman
- 01/11/2021_Consultation Response - South West Water
- 03/11/2021_Consultation Response - Devon & Somerset Fire & Rescue Service
- 04/11/2021_Objection - AJ Walker
- 04/11/2021_Consultation Response - ECC Tree Manager
- 05/11/2021_Objection - James McClune
- 09/11/2021_Consultation Response - Police Designing Out Crime Officer
- 10/11/2021_Consultation Response - Exeter Cycling Campaign
- 10/11/2021_Consultation Response - Natural England
- 11/11/2021_Objection - Treger
- 11/11/2021_Objection - Julie Walker
- 12/11/2021_Objection - Mr and Mrs C Dent
- 13/11/2021_Objection - Josephine Nott
- 12/11/2021_Consultation Response - ECC Environmental Health Officer
- 12/11/2021_Consultation Response - RSPB
- 15/11/2021_Consultation Response - DCC (LLFA)
- 17/11/2021_Objection - Devon Buildings Group
- 16/11/2021_Objection - M R Hardy
- 09/11/2021_Objection - M Williams
- 18/11/2021_Consultation Response - DCC (WastePlanning Authority)
- 22/11/2021_Consultation Response - ECC Local Plans Team
- 20/12/2021_Exeter Airport - Updated response
- 29/12/2021_Consultation Response - Exeter Civic Society Objection
- 14/01/2022_Consultation Response - ECC Principle Project Manager (Heritage)
- 24/01/2022_Consultation Response - ECC(Parks and Green Spaces)
- 20/01/2022_Revised Consultation response - ECC (Tree Manager)
- 05/11/2021_Consultation Response - NHS Devon Clinical Commissioning Group
- 24/02/2022_objection Revised plans - Mr and Mrs Dent 24 02 22 update
- 08/03/2022_Consultation Response - DCC (Highway Authority) 21.1564.OUT
- 10/03/2022_Email enclosing consultation response on behalf of DCC as Highway Authority
- 10/03/2022_Consultation Response (Revised) - DCC (LLFA) FRM.ECC.1564.2021 Response 2
- 07/03/2022_Consultation Response - H&SE (Planning Gateway One)
- 30/06/2022_Exeter International Airport
- 01/07/2022_Exeter Cycling Campaign (Objects)
- 04/07/2022_Natural England
- 05/07/2022_Devon & Somerset Fire & Rescue Service
- 05/07/2022_Public and Green Spaces Team
- 08/07/2022_Police Designing Out Crime Officer
- 12/07/2022_South West Water
- 13/07/2022_NHS Devon
- 18/07/2022_Environmental Health
- 18/07/2022_Waste & Recycling Team
- 19/07/2022_Waste Planning Authority (DCC)
- 19/07/2022_Local Highway Authority (DCC)
- 19/07/2022_Tree Manager (Objects)
- 19/07/2022_Health & Safety Executive
- 15/07/2022_NHS Devon
- 20/07/2022_RSPB
- 21/07/2022_Exeter Civic Society
- 22/07/2022_Living Options Devon
- 22/08/2022_Health & Safety Executive
- 01/12/2022_EDQP - Design Review Report
- 12/01/2023_NHS Devon ICB
- 12/01/2023_Local Highway Authority (DCC)
- 12/01/2023_South West Water
- 11/01/2023_Exeter International Airport
- 18/01/2023_Devon & Somerset Fire & Rescue Service
- 18/01/2023_Waste Planning Authority (DCC)
- 17/01/2023_Exeter Cycling Campaign
- 26/01/2023_Natural England
- 31/01/2023_Police Designing Out Crime Officer
- 31/01/2023_J Wilkinson (Objects)
- 05/02/2023_Civic Society Planning sub-committee (Objects)
- 06/02/2023_J McClune (Objects)
- 10/02/2023_Environmental Health
- 10/02/2023_Lead Local Flood Authority (DCC)
- 10/02/2023_Urban Design & Landscape Officer
- 10/02/2023_Waste & Recycling Team (ECC)
- 10/02/2023_Tree Manager (ECC)
- 10/02/2023_Health & Safety Executive
- 10/02/2023_Health & Safety Executive Email
- 14/02/2023_Disability Access Champion, Living Options Devon
- 14/02/2023_RSPB
- 15/02/2023_NHS Devon ICB
- 15/02/2023_Civic Society Planning sub-committee - Withdraw objection
- 17/02/2023_Heritage Officer (ECC)
- 16/02/2023_Lead Local Flood Authority (DCC)
- Decision
- Drawings and Plans
- 07/10/2021_Superseded Proposed Plan level 4 Co-living 4th Floor PBSA 3rd Floor drawing no. A11910D0104I1
- 07/10/2021_Site Location Plan
- 07/10/2021_Superseded Proposed plan level 5 Co-living 5th floor PBAS 4th Floor drawing no. A11910D0105I1
- 07/10/2021_SUPERSEDED Proposed Site Context Sections drawing no. A11910D0300I1
- 07/10/2021_Superseded Proposed Sections CC drawing no. A11910D0302I1
- 07/10/2021_Superseded Proposed Sections DD drawing no. A11910D0303I1
- 07/10/2021_Superseded Proposed Section EE drawing no. A11910D0304I1
- 07/10/2021_Superseded Proposed Sections AA & BB drawing no. A11910D0301I1
- 07/10/2021_SUPERSEDED Proposed Elevations A1 & A2 drawing no. A11910D1201I1
- 07/10/2021_Superseded Proposed plan level 3 Co-living 3rd floor PBSA 2nd floor drawing no. A11910D0103I1
- 07/10/2021_Existing Basement, 1st, 2nd, 3rd & 4th floor plans drawing no. A11910F0101I1
- 07/10/2021_SUPERSEDED Proposed Elevations E & F drawing no. A11910D1204I1
- 07/10/2021_SUPERSEDED Proposed Elevations C & D drawing no. A11910D1203I1
- 07/10/2021_Existing Site elevations drawing no. A11910F0200I1
- 07/10/2021_Existing Site Elevations Drawing no. A11910F0201I1
- 07/10/2021_SUPERSEDED Proposed Elevations B1 & B2 Drawing no. A11910D1202I1
- 07/10/2021_Existing Site sections Drawing no. A11910F0300I1
- 07/10/2021_Existing Ground floor plan drawing no. A11910F0100I1
- 07/10/2021_SUPERSEDED Proposed Site plan Drawing no. A11910D0003I1
- 07/10/2021_Existing Site plan Drawing no. A11910D0002I1
- 07/10/2021_Superseded Proposed plan level B Co-living lower ground floor drawing no. A11910D0099I1
- 07/10/2021_SUPERSEDED Proposed Fire service site plan Drawing no. A11910S0003P1
- 07/10/2021_Superseded Proposed plan level 0 Co-living ground floor PBSA lower ground floor Drawing no. A11910D0100I1
- 07/10/2021_SUPERSEDED Proposed plan Ground floor showing potential bus lane Drawing no. A11910W0001I1
- 07/10/2021_Superseded Proposed plan level 6 Co-living 6th floor PBSA 5th floor drawing no. A11910D0106I1
- 07/10/2021_Superseded Proposed plan level 1 Co-living 1st floor PBSA ground floor Drawing no. A11910D0101I1
- 07/10/2021_Superseded Proposed plan level 7 Roof Drawing no. A11910D0107I1
- 07/10/2021_Superseded Proposed plan level 2 Co-living 2nd floor PBSA 1st floor Drawing no. A11910D0102I1
- 28/01/2022_SUPERSEDED Additional Tree Plan 5519-OOB-XX-XX-SK-L-0007
- 28/01/2022_SUPERSEDED Additional Sketch Site Plan 5519-OOB-XX-XX-SK-L-0005
- 28/01/2022_SUPERSEDED Additional Planting Plan 5519-OOB-XX-XX-SK-L-0006
- 28/01/2022_SUPERSEDED Proposed plan level 0 Co-living ground floor PBSA lower ground floor Drawing no. A11910D0100I2
- 28/01/2022_SUPERSEDED Proposed plan level 1 Co-living 1st floor PBSA ground floor Drawing no. A11910D0101I2
- 28/01/2022_SUPERSEDED Proposed plan level 5 Co-living 5th floor PBAS 4th Floor drawing no. A11910D0105I2
- 28/01/2022_SUPERSEDED Proposed Plan level 4 Co-living 4th Floor PBSA 3rd Floor drawing no. A11910D0104I2
- 28/01/2022_SUPERSEDED Proposed plan level 7 Roof Drawing no. A11910D0107I2
- 28/01/2022_SUPERSEDED Proposed plan level 3 Co-living 3rd floor PBSA 2nd floor drawing no. A11910D0103I2
- 28/01/2022_SUPERSEDED Proposed plan level 2 Co-living 2nd floor PBSA 1st floor Drawing no. A11910D0102I2
- 28/01/2022_SUPERSEDED Proposed plan level 6 Co-living 6th floor PBSA 5th floor drawing no. A11910D0106I2
- 28/01/2022_SUPERSEDED Proposed plan level B Co-living lower ground floor drawing no. A11910D0099I2
- 28/01/2022_SUPERSEDED Proposed Section EE drawing no. A11910D0304I2
- 28/01/2022_SUPERSEDED Proposed Sections AA & BB drawing no. A11910D0301I2
- 28/01/2022_SUPERSEDED Proposed Sections DD drawing no. A11910D0303I2
- 28/01/2022_SUPERSEDED Proposed Sections CC drawing no. A11910D0302I2
- 28/01/2022_SUPERSEDED Additional setting out plan A11910D0005I1
- 28/01/2022_SUPERSEDED Additional Site Phasing Plan A11910D0004I1
- 28/01/2022_SUPERSEDED Proposed Site plan Drwg no. A11910D0003I2
- 28/01/2022_SUPERSEDED Additional Site Plan (with Bus lane) drwg no. A11910D0006I1
- 24/06/2022_SUPERSEDED Site plan Proposed (A11910 D 0003 Rev 4)
- 24/06/2022_SUPERSEDED Phasing plan (A11910 D 0004 Rev 3)
- 24/06/2022_SUPERSEDED Setting out based on current Stage 2 design Information (A11910 D 0005 Rev 3)
- 24/06/2022_SUPERSEDED Proposed plan level B Co-living lower ground floor (A11910 D 0099 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 0 Co-living ground floor PBSA lower ground floor (A11910 D 0100 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 1 Co-living first floor PBSA ground floor (A11910 D 0101 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 2 Co-living second floor PBSA first floor (A11910 D 0102 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 3 Co-living third floor PBSA second floor (A11910 D 0103 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 4 Co-living fourth floor PBSA third floor (A11910 D 0104 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 5 Co-living fifth floor PBSA fourth floor (A11910 D 0105 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 6 Co-living sixth floor PBSA fifth floor (A11910 D 0106 Rev 4)
- 24/06/2022_SUPERSEDED Proposed plan level 7 Roof (A11910 D 0107 Rev 4)
- 24/06/2022_SUPERSEDED Elevations A1 & A2 Proposed (A11910 D 0201 Rev 2)
- 24/06/2022_SUPERSEDED Elevations B1 & B2 Proposed (A11910 D 0202 Rev 2)
- 24/06/2022_SUPERSEDED Elevations C & D Proposed (A11910 D 0203 Rev 2)
- 24/06/2022_SUPERSEDED Elevations E & F Proposed (A11910 D 0204 Rev 2)
- 24/06/2022_SUPERSEDED Site Context Sections Proposed (A11910 D 0300 Rev 3)
- 24/06/2022_SUPERSEDED Sections AA & BB Proposed (A11910 D 0301 Rev 3)
- 24/06/2022_SUPERSEDED Sections CC Proposed (A11910 D 0302 Rev 3)
- 24/06/2022_SUPERSEDED Sections DD Proposed (A11910 D 0303 Rev 3)
- 24/06/2022_SUPERSEDED Section EE Proposed (A11910 D 0304 Rev 3)
- 28/06/2022_SUPERSEDED Co-Living Courtyard (5519-OOB-XX-XX-SK-L-9001 Rev P03)
- 28/06/2022_SUPERSEDED Green Link (5519-OOB-XX-XX-SK-L-9002 Rev P03)
- 28/06/2022_SUPERSEDED PBSA Courtyard 1 (5519-OOB-XX-XX-SK-L-9003 Rev P02)
- 28/06/2022_SUPERSEDED PBSA Courtyard 2 (5519-OOB-XX-XX-SK-L-9003 Rev P02)
- 28/06/2022_SUPERSEDED Sketch Site Plan (5519-OOB-XX-XX-SK-L-0005 Rev P12)
- 28/06/2022_SUPERSEDED Planting (5519-OOB-XX-XX-SK-L-0006 Rev P12)
- 28/06/2022_SUPERSEDED Tree Plan (5519-OOB-XX-XX-SK-L-0007 Rev P12)
- 28/06/2022_SUPERSEDED Pedestrian and Vehicular Access Arrangement (72032-CUR-00-XX-DR-TP-75007-P02)
- 28/06/2022_SUPERSEDED Proposed plan level 1 Co-living first floor PBSA ground floor (A11910 D 0101 Rev 4)
- 08/08/2022_SUPERSEDED Proposed plan level 0 Co-living ground floor PBSA lower ground floor.pdf
- 08/08/2022_SUPERSEDED Proposed plan level 1 Co-living first floor PBSA ground floor.pdf
- 08/08/2022_SUPERSEDED Proposed plan level 2 Co-living second floor PBSA first floor.pdf
- 08/08/2022_SUPERSEDED Proposed plan level 3 Co-living third floor PBSA second floor.pdf
- 08/08/2022_SUPERSEDED Proposed plan level 4 Co-living fourth floor PBSA third floor.pdf
- 08/08/2022_SUPERSEDED Proposed plan level 5 Co-living fifth floor PBSA fourth floor.pdf
- 08/08/2022_SUPERSEDED Proposed plan level 6 Co-living sixth floor PBSA fifth floor.pdf
- 08/08/2022_SUPERSEDED Proposed plan level B Co-living lower ground floor.pdf
- 09/01/2023_Sketch Site Plan (5519-OOB-XX-XX-SK-L-0005 Rev P13)
- 09/01/2023_Planting (5519-OOB-XX-XX-SK-L-0006 Rev P13)
- 09/01/2023_Tree Plan (5519-OOB-XX-XX-SK-L-0007 Rev P14)
- 09/01/2023_Co-Living Courtyard (5519-OOB-XX-XX-SK-L-9001 Rev P04)
- 09/01/2023_Green Link (5519-OOB-XX-XX-SK-L-9002 Rev P04)
- 09/01/2023_PBSA Courtyard (5519-OOB-XX-XX-SK-L-9003 Rev P04)
- 09/01/2023_Pedestrian and Vehicular Access Arrangement (72032-CUR-00-XX-D-TP-05001-P08)
- 09/01/2023_Swept Path Analysis Fire Tender (72032-CUR-00-XX-D-TP-05002-P02)
- 09/01/2023_Pedestrian and Vehicular Access Arrangement (72032-CUR-00-XX-DR-TP-75007 Rev P03)
- 09/01/2023_Site plan Proposed (A11910D0003 Rev 5)
- 09/01/2023_Phasing plan (A11910D0004 Rev 4)
- 09/01/2023_Setting out based on current Stage 2 design information (A11910D0005 Rev 4)
- 09/01/2023_Proposed plan level B Co-living lower ground floor (A11910 D 0099 Rev 8)
- 09/01/2023_SUPERSEDED Proposed plan level 0 Co-living ground floor PBSA lower ground floor (A11910 D 0100 Rev 8)
- 09/01/2023_Proposed plan level 1 Co-living first floor PBSA ground floor (A11910 D 0101 Rev 8)
- 09/01/2023_Proposed plan level 2 Co-living second floor PBSA first floor (A11910 D 0102 Rev 8)
- 09/01/2023_Proposed plan level 3 Co-living third floor PBSA second floor (A11910 D 0103 Rev 7)
- 09/01/2023_Proposed plan level 4 Co-living fourth floor PBSA third floor (A11910 D 0104 Rev 7)
- 09/01/2023_Proposed plan level 5 Co-living fifth floor PBSA fourth floor (A11910 D 0105 Rev 7)
- 09/01/2023_Proposed plan level 6 Co-living sixth floor PBSA fifth floor (A11910 D 0106 Rev 7)
- 09/01/2023_Proposed plan level 7 Roof (A11910 D 0107 Rev 6)
- 09/01/2023_Elevations A1 & A2 Proposed (A11910 D 0201 Rev 4)
- 09/01/2023_Elevations B1 & B2 Proposed (A11910 D 0202 Rev 4)
- 09/01/2023_Elevations C & D Proposed (A11910 D 0203 Rev 4)
- 09/01/2023_Elevations E & F Proposed (A11910 D 0204 Rev 4)
- 09/01/2023_Sections AA & BB Proposed (A11910 D 0301 Rev 5)
- 09/01/2023_Sections CC Proposed (A11910 D 0302 Rev 5)
- 09/01/2023_Sections DD Proposed (A11910 D 0303 Rev 5)
- 09/01/2023_Section EE Proposed (A11910 D 0304 Rev 5)
- 09/01/2023_Fire service site plan Proposed (A1190 S 0003 Rev P3)
- 15/02/2023_Site Context Sections Proposed (A11910 D 0300 Rev 4)
- 15/02/2023_Proposed plan level 0 Co-living ground floor PBSA lower ground floor (A11910 D 0100 Rev 9)
- Officers Report
- Other Application Information
- 19/10/2021_Consultation Email to consultees
- 17/12/2021_Agent email providing report re green roofs in response to Exeter Airport consultation response
- 03/02/2022_Consultee - Email reconsultation re revised plans
- 17/02/2022_Agent email re progress and enclosing Public Realm views document
- 22/02/2022_Agent email response to DCC (LLFA) consultation and enclosing revised FRA
- 11/04/2022_Applicants Highway consultant response to DCC Consultation response
- 15/07/2022_Applicant response to HSE comments
- 03/08/2022_Heavitree Road, Exeter HSE Response - File Note (TP Bennett, 02.08.2022)
- 24/08/2022_Exetenision of time for decision agreement to 17.10.2022
- 05/01/2023_Extension of time for decision agreement (21.02.2023)
- 09/02/2023_Agent Email re Exeter Civic Society Comments
- 06/02/2023_Agent Email re Police Comments
- 15/02/2023_Agent Response to Waste & Recycling Team (ECC) comments
- 15/02/2023_Agent Email re amended ground floor plan and co-living bin store external access
- 20/02/2023_Habitats Regulations Assessment